Laserfiche WebLink
consumption <br />and ~rojacted <br /> <br />12. <br /> <br />~:!:.~iE~ficant Effect: increased ener~%y <br />occur as the result of site acti'v~l~]c!s <br />coltEq~.:te trips. <br /> <br />Fimding: Provisions for reducing automobile co~-nutjn~ and <br />encouragimg alternative means of transportation will <br />reduce vehicle miles travel led and energy consumption. <br /> <br />Facts: The developers are requjred to provide for a <br />program of coordinated, alternative transportation systems <br />for employees throughout the site, including vanpooling~ <br />carpooling, and alternative work hours. <br /> <br />Finding: incorporation of solar energy measures in building <br />design will reduce energy consumption. <br /> <br />Facts: The utilization of passive and active solar energy <br />measures will be required for all buildings to the maximum <br />extent feasible. <br /> <br />Finding: Economic and social considerations make the <br />reduced scale or "no project" alternatives, which would <br />result in reduced energy consumption, infeasible. <br /> <br />Facts: The scale of the Droject is necessary in maintaining <br />the marketability of the kite in order to provide increased <br />employment opportunities to the local co~nunity and to <br />increase the tax base of the City. <br /> <br />Significant Effect: Water supDly requirements will a'~cceed <br /> distribution capacit~Z <br /> <br />Finding: The required water supply and distribution system <br />facilities wii] be constructed in conjunction with develop- <br />ment, mitigating any impact. <br /> <br />Facts: The developers are required to restrict site. <br />development until adequate water supplies facilities and <br />long range requirements have been determined to be adequately <br />achieved, <br /> <br />SiEnif/cant Effect: Project uses ~l~3uid ge~erate semTage <br />~'~l ~7~i~ ~'pacity available to the site. <br /> <br />Finding: Project: conditions mitigate potential impacts. <br /> <br />Facts: Building-b%-building approval process ensures <br />control over capacity; conditions guarantee no guarantee <br />of sewer capacity is included in the approval. <br /> <br />Finding: Additional capacity would mitigate <br /> <br />Fact:s;: E~<pac~ded fac_~lities are being discussed by <br />n!aply r~!spon3i~le agencies; an EiR would be required <br />before an', expansion could be made. <br /> <br />-5- <br /> <br /> <br />