Laserfiche WebLink
In addition, a new parallel 24" line should be provided between <br />Hacienda Drive and Santa Rita Road to handle the excess flow in the <br />existing trunk line. <br /> <br />New Stoneridge Drive to Hopyard Road - New Pressure Line to Pump <br />Station ~ New Pump Station at SPRR & Arroyo Mocho. <br /> <br /> A new pump station could be provided at the intersection of <br />the S.P. railroad tracks and the Arroyo Mocho to intercept the flow <br />in the existing trunk line east of this point (Pt. 14, Figure 5). <br />A new ]1he shouId be provided running from this pump station and <br />connecting to the new Stoneridge (gravity) line at Hopyard Road. <br />The gravity line in Stoneridge west of Hopyard Road would still be <br />required to intercept the fiow from the 18" line down Hopyard Road. <br />This pump station will relieve 7.6 MGD from the current and <br />projected (probable) flow with the new pump station and Stoneridge <br />line. The flow in the last reach of the existing trunk line would <br />be 10.5 MGD vs. an 11.0 MGD capacity. <br /> <br />-10- <br /> <br /> <br />