My WebLink
|
Help
|
About
|
Sign Out
RES 83214
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1983
>
RES 83214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2012 2:36:01 PM
Creation date
2/2/2000 11:23:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/24/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1I. <br /> <br />ANAL YS I S <br /> <br />A. O__r_iginal Entitlement _E_l_ow__s _v_s_:_._E_x_.i__s_ting Trunk Capacity <br /> <br /> A comparison of the maximum existing tunk line capacity versus the <br />original entitlement is shown in Figure 3. The total original entitlement <br />for the entire study area, including the additional 1.75 MGD reserve, is <br />[0.4 MGD, although the existing capacity is l] .0 MGD at the last section <br />of ,trunk main. As can be seen by Figure 3, the original entitlement <br />exceeds the existing capacity in some sections of the trunk sewer, <br />pa'rticularly east, of Santa Rita Road. <br /> <br />B. HBP Projected Flows Plus Other Areas at Original Entitlement vs. Existing <br /> Trunk Capac!t__y <br /> <br /> Comparison of the maximun~ existing trunk line capacity against tile <br /> <br />flow generated based on ItBP's projected Flow requirement and the original <br />entitlement for all otheY areas shows Flow generated exceeds the capacity <br />in several sections of the lowel' portion of the line. TIle last reach having <br />a flow of 15.4 MGD, including the additional 1.75 MGD reserve, and a <br />capacity of 11.0 MGB. The upper portion, last of Santa Rita Road, would <br />remain deficient as discussed above. <br /> <br />C. Current or Projected Flow at Full Buildout (For Total Study Area) vs. <br /> Existing Trunk Capacity <br /> <br /> A comparison of the current or projected flow requirement at full <br />buildout for the entir'e study area and the lnaxfnlum existing tr, t~r~k line <br />capacity was made. lh~s dnalysis assumed ali areas generating their' <br />current or projected sewage Flow and [he area south ot Arroyo Mocho and <br />east of Santa Rita Road are allowed to flow up to the 1.75 MGD assumed in <br />the Black report. An allowance was also made to accommodate .20 MGD reclaimed <br />water from a possible future pre-treatn~ent: plant within Hacienda Business Park~ <br />As expected, the flow gen~rated is greater than the capacity in dhnost the <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.