Laserfiche WebLink
EXHIBIT B <br /> <br />ESTI~TED COST OF SUNOL BLVD. IMPROVEMENTS AS RELATED <br />TO THE PROFICIENT FOODS DEVELOPMENT FOR BOND PURPOSES <br /> <br /> Item Quantity <br /> <br /> 1. Aspbaltic Concrete 235 Ton <br /> (Type B) <br /> <br /> 2. Aggregate Base & Subbase 1107 Ton <br /> (C1. iI) <br /> <br /> 3. Storm Drain System L.S. <br /> <br /> 4. P.C.C. Sidewalk 267 L.F. <br /> including Baserock <br /> <br /> 5. Curb and Gutter 267 L.F. <br /> including Baserock <br /> <br /> 6. Removal of existing 55 L.F. <br /> concrete curb <br /> <br /> 7. Handicap Ramps 2 Ea. <br /> 8. Relocation of Signs 1 Ea. <br /> <br />9. Remove groundcover and L.S. <br />shrubs <br />,0. Street Trees 5 Ea. <br /> <br />_1. Electroliers 2 Ea. <br /> <br />Unit Prices <br />(In Figures) <br /> <br />70.00 <br /> <br />15.00 <br /> <br />2.15 <br /> <br />7.50 <br /> <br />~.00 <br /> <br />250.00 <br />125.00 <br />300.00 <br />60.00 <br />,500.00 <br /> <br />Unit Prices <br />(In Figures) <br /> <br />16,450.00 <br /> <br />16,605.00 <br /> <br />6,500.00 <br /> 574.05 <br /> <br />2,002.50 <br /> <br />275.00 <br /> <br />500.00 <br />125.00 <br />300.00 <br />300.00 <br />3,000.00 <br /> <br />Total 46,631.55 <br /> <br /> <br />