My WebLink
|
Help
|
About
|
Sign Out
RES 83152
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1983
>
RES 83152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:03:05 PM
Creation date
2/2/2000 12:38:36 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/26/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4, Ide~ti~y Pr~liminar,~ Transit Alternatives <br /> <br /> 4.1 Develop set of preliminary transit alternatives outlining different <br /> methods of accomplishing objectives. The alternatives should be <br /> constrained by reasonable expectations of the availability of the <br /> long range funding. They should also identity various reasonable <br /> institutional and organizational options for implementing a transit <br /> program. <br /> <br /> 4.2 For each alternative, assess the potential to meet objectives, <br /> determine the funding requirements, and define the implementation <br /> program, <br /> <br /> 4,3 Prepare a report on th£ preliminary alternativ~s~ <br /> <br />5~ Analyze and Evaluate Transit Alternatives <br /> <br /> 5~) D~velop criteria to analyze and evaluate alternatives, e~g. potential <br /> for meeting transit objectives, cost, feasibility of implementation. <br /> <br /> 5,2 Select a few alternatives and study in detail. <br /> <br /> 5,3 Prepare environmental assessment of transit alternatives~ <br /> <br /> 5.4 Submit report on 5.2 above, to include evaluation of work alternative <br /> against criteria established in 5.1 above. <br /> <br /> 5.5 Select preferred alternative. <br /> <br />6, Prepare Transit Plan <br /> <br />6,) Prepare and submit detailed transit plan for preferred alternative <br /> addressing organization, operation, and implementation. <br /> <br />6.2 Review transit plan and make revisions as required. <br /> <br />6.3 Prepare and submit final Transit Plan for approval. <br /> <br />Schedule of Deliverables <br /> <br />Product <br /> <br /> Task <br /> <br />)~ Overall Project Plan <br />2- Identification and Analysis of Transit 2.4 <br /> Needs <br />3~ Transit Objectives 3.2 <br />4~ Project Report <br />5. Identification of Preliminary Alternatives 4.3 <br />6~ Environmental Assessment of Transit <br /> Alternatives 5.3 <br />I Detailed Analysis and Evaluation of 5.4 <br /> Transit Alternatives <br />~.~ Draft Transit Plan 6.1 <br />9~ Final Transit Pla~ 6.3 <br /> <br />Delivery Date <br /> <br />May 20, 1983 <br />June 17, 1983 <br /> <br />June 30, 1983 <br />june 30, 1983 <br />N/A <br /> <br />N/A <br />N/A <br /> <br />N/A <br />N/A <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.