Laserfiche WebLink
Assessment District Contract. <br />Job 4887-1 <br />Date: 6/6/82 <br />Page 5 of 9 <br /> <br />j. Project management and/or inspection. <br /> <br /> Filing of Record of Survey. <br /> <br />1. Any other services not specified in Section A, Scope of Work. <br />m. Landscape plans for north and west side of onsite roadways. <br /> <br />B. Engineer's Fees <br /> <br />]. As compensation for the work accomplished under Section <br /> Work, the City shall pay to Engineer as follows: <br /> <br />a. For Item A-1 (a) Topographic Services: <br /> a lump sum of 39,000. <br /> <br />b. For Item A-1 (b) Parcel Map: <br /> a lump sum of 52,600. <br /> <br />A, Scope of <br /> <br />c. For Item A-2 (a thru h) and Item A-3 (a and b) Plans and <br /> Specifications: <br /> 33,500 plus that percentage of the total construction and utility <br /> cost (less the cost of the bridge, traffic signal, !andscapjng and <br /> contingencies) as prescribed by ASCE Curve A (Exhibit "A" <br /> attached). <br /> <br />d. For Item A-2 (i) Assessment Proceedings: <br /> ~o percent of final, total construction and utility cost. <br /> <br />e. For Item A-2 (j) [~ndscape Plans and Speciflcatjons: <br /> a lump sum of <br /> <br />and ut~ ] ~ t5, cost less <br /> <br />For Item A-4 - Co~struction Staking: <br />Three percent of final, total construction <br />the cost of ]an~scap~ng. <br /> <br />g. Fl~r Item A-5: <br /> T{~l]r charge rates as shown ~n Exhibit "C" (attached). <br /> <br />withfn thirty days of receipt ~f prnceeds from the sale of the bonds <br /> <br /> <br />