Laserfiche WebLink
Assessment District Contract <br />Job 4887-I <br />Date: 6/6/82 <br />Page 3 of 9 <br /> <br />roll and other engineering documents applicable to assessment <br />district proceedings. Ten copies of preliminary Engineer's Report <br />and ten copies of the final Engineer's Report shall be provided to <br />the City. <br /> <br />Prepare Landscape, Irrigation and Tree Preservation Plans, <br />Specifications, Bid Documents, and cost estimates for Valley <br />Avenue Iwest side a~d is]and), Be rnal Avenue (north side and <br />is]and), entry rnads (both sides and islands) interior roadways <br />(south ~nd east sides only) and the south side of the Arroyo Del <br />Va!le. <br /> <br />3. Construction Services <br /> <br />Following approval. by City of the detailed Working Drawings, <br />Specifications, Contract and Bidding Documents, Engineer shall assist <br />City in so!ic[t].ng Gualifjed bids from contractors for the work to be <br />performed pursuant to the approved contract documents and shall assist <br />jn the evaluation of b~ds, b~dders, requests for substitutions and in <br />the preparation of contract addenda. <br /> <br />Engineer shall: <br /> <br />Furnish appropriate engineering advice and consulting during <br />project construction by correspondence, telephone and visits to <br />the project to observe the wor>~ in progress and by conferences, as <br />requested by City, and datemine in general if the work is <br />proceeding in accordance with the Contract documents. On the <br />basis of such on-s~ te observations, Engineer shall endeavor te <br />c~lard City against defect~ and deficiencies ~n the work of the <br />contractor. Engineer sba ] ] not be required to check qual[ty or <br />quantity of the work. Engineer sball not be responsible under <br />this paragraph 4 for construction means, methods, techniques, <br />sequences or procedures, or for safety precautions and programs in <br />connection with the work and shall not be respons~ ble for <br />contract~r's failure to carry out the work in accf~rda~ce with the <br /> <br />h. Assist in preparing change orders authorized by City. <br /> <br />C~ncurrenrtv with Section 3 <br />construction stakes for <br /> <br />(lbove), Engineer <br /> <br />shall provide one set ,~f <br /> <br /> <br />