Laserfiche WebLink
21. <br /> <br />22. <br /> <br />23. <br /> <br />24. <br /> <br />25. <br /> <br />That approval of the storm drainage system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the system is adequate, connects to an <br />approved point of discharge, meets any and all <br />applicable requirements of the Alameda County Flood <br />Control District, meets any and all applicable <br />requirements of the Federal Emergency Management <br />Flood Hazard Program, and meets the immediate and <br />long-range requirements of this development and all <br />upstream areas intended to be drained through this <br />'tract. <br /> <br />That ~he grading and drainage plan include all <br />required information to satisfactorily effect the <br />abandonment of the existing storm drain channel <br />along the wesn side of the SPRR right-of-way <br />including alternate flow paths and outfalls. <br /> <br /> That electric power distribution, gas distribution, <br /> cor.munication service, and any required alaEn systems <br /> be installed underground in a joint utility trench <br /> unless otherwise specifically approved by the City <br /> Engineer. <br /> <br /> That the developer be responsible for the installa- <br /> tion of tile street lighting system within the <br /> development. The street lights shall be 70 watt, <br /> high pressure sodium vapor units mounted on ga!- <br /> vanized ste=! poles with poured in place bases, <br /> on the LS-LC schedule per City requirements and <br /> P.G.andE. standard details unless otherwise <br />-specificall.3' approred. Approval for the number, <br />!scanion, .~nd type of e!ectroliers shall be <br />withtel! i~onding final design and review by the <br />City Engineer. <br /> <br />Tl.~t in-ii.?a uark dedication f~'~.7 be collected t,. <br />~ City Drier to apDro~zal of the ~u-~l :'aa~ at the <br />raze then in effect Ind ~Yor the total nunlher of <br />lots ix the final ma?, u.~iess this requirement <br /> <br />will_ c!use n seqre{j.~tiis~.~ to b.-~ completed in <br /> <br /> <br />