Laserfiche WebLink
INSERT <br /> <br />Los Positas Boulevard CrOssing BO-65.8 <br /> City of Pleasanton <br /> <br /> 12. Railroad shall furnish the necessary labor, materials, tools <br />and equipment and shall perform the following work: <br /> <br />(a) <br /> <br />Install four (4) flashing light grade crossing <br />signals equipped with automatic gate arms, two <br />(2) of which will have additional light units <br />mounted on cantilever arms, together with neces- <br />sary actuating and operating circuits and adequate <br />instrument housing, hereinafter collectively re- <br />ferred to as "signals," at said highway. Said <br />signals shall be located. approximately as shown <br />on the print of Railroad's Drawing A-2138 revised <br />October 29, 1982, attached and made a part hereof. <br />Installation of and all materials for said signals <br />shall be in accordance with Railroad's usual standards. <br /> <br />(b) <br /> <br />Prepare track, including rail renewal and installation <br />of cross ties. <br /> <br />(c) <br /> <br />Install subgrade stabilization, including drain pipes <br />and fabric; and <br /> <br />(d) <br /> <br />install inside headers and AC paving through the entire <br />crossing area. <br /> <br /> Grantee agrees to reimburse Railroad for one hundred percent (100%) of <br />the cost and expense incurred by Railroad in furnishing materials and per- <br />forming the work specified in this Section 12. <br /> <br /> ]3. Following execution of this instrument, Railroad will order the <br />delivery of all materials required to perform the work contemplated herein <br />and shall submit to Grantee a bill for eighty percent (80%) of Grantee's <br />share of the estimated cost of materials~ to be furnished by Railroad. As <br />soon as Lhc crossing signals and/or the crossing surface have been placed <br />in operation, Railroad shall submit to Grantee bills for eighty percent <br />(~0%) of Grantee's share of the est]mated cost of applicable labor furnished <br />by Railroad. Following completion of audit, Railroad shall submit to Grantee <br />a final bill for the actual total cost of the work performed by Railroad, <br />lcss the progress payments made by Grantee hereunder. Grantee shall pay <br />all of such bills promptly. <br /> <br /> In the event progress payments made by Grantee exceed the audited total <br />final cost, the difference sh~ll be promptly refunded to Grantee by Railroad. <br /> <br />Page 1 of Insert <br /> <br /> <br />