Laserfiche WebLink
TIME OF <br /> <br />bid within 15% of the fixed budget limit of con- <br />struction. CITY will cooperate with CONSULTANT <br />in order to effect Such reduction. CONSULTANT <br />sha].l have the option of including alternate bid <br />i~ems, additive items or deduct items acceptable <br />t~, CITY so as to permit flexibility in accepting <br />a bid within the budgeted construction limit. <br /> <br />If upon completion of the work described above, <br />and the award of construction contract is delayed <br />for more than three (3) months after CONSULTANT's <br />submission of the revised working drawings and <br />specifications and estimates, CITY shall have the <br />option to: <br /> <br />a. Increase the construction budget; or <br /> <br />Authorize CONSULTANT to furnish addi- <br />tional alternate bid items, CONSULT- <br />ANT's compensation for which shall be <br />on an Extra Work basis; or <br /> <br />Authorize CONSULTANT to redesign to <br />bring PROJECT within the budget, <br />CONSULTANT's compensation for which <br />shall be on an Extra Work basis; or <br /> <br />d. Cancel agreement as per Section VII. <br /> <br />Both options (b) and (c) above shall be consid- <br />ered Extra Work and paid for on a Time-and-Mate- <br />rials basis in accordance with Section I.D. <br /> <br />COMPLETION <br /> <br />All work described in SeCtion I.A. shall be completed <br />by April 30, 1985. <br /> <br />All work described in SeCtion I.B shall be completed <br />within One Hundred and Twenty (120) days from the <br />date of approval of I.A. work by CITY, plus exten- <br />sions for delays beyond Control of CONSULTANT. <br /> <br />All work described in SeCtion I.C. shall be completed <br />within the period allowed for completion of the con- <br />struction contract. <br /> <br />7 <br /> <br /> <br />