My WebLink
|
Help
|
About
|
Sign Out
RES 84590
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2012 4:25:12 PM
Creation date
1/27/2000 11:38:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/27/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD REQUZREHENTS FOR A TRAFFZC STUDY <br /> <br /> iN NORTH PLEASANTON <br /> <br />As approved by the City of Pleasanton <br /> <br />__, 1984. <br /> <br />The standards described herein have been adopted by the City of <br />Pleasanton for use on all traffic studies within the north Pleasanton <br />area. All proposed development within the north Pleasanton area is <br />required to submit a traffic study, prepared by a registered traffic <br />engineer at the time of plan submittal, unless this requirement is <br />waived by the Planning Director. <br /> <br />In addition to the standards requirements listed herein, the traffic <br />report shall include a description of the project, a summary of <br />projected impacts and any required mitigation measures. The north <br />Pleasanton traffic studies primarily consist of an analysis of specified <br />intersections during the evening peak hour and the site and circulation <br />plan of the proposed use. <br /> <br />The following assumptions shall apply: <br /> <br />Land Use - In addition to the proposed project being considered, <br />traffic from all projects approved by the City of Pleasanton and not <br />100 percent occupied as of the date of the most recent Citywide <br />traffic survey period shall be included. The approved list of <br />projects will be continually expanded as projects are approved by <br />the City of Pleasanton. The current list is shown in Table I. <br />Subsequent lists will be certified by the City prior to commencement <br />of each traffic study. <br /> <br />Occupancy - The occupancy of each building (or the percentage of its <br />square footage occupied by intended uses) as of the date of the most <br />recent Citywide traffic survey will also be certified by the City <br />prior to the commencement of the study. Occupancy figures will only <br />change once a year and will coincide with the date of the Citywide <br />traffic survey. The traffic study shall include the traffic from <br />the unoccupied portions of all development described in "Land Use", <br />above. For example, if a project is 80 percent occupied, only the <br />traffic from the unoccupied 20 percent of the development would need <br />to be considered in the new traffic study. Traffic from the <br />occupied 80 percent has already been measured and is included in the <br />"existing traffic conditions" measured during the Citywide traffic <br />surveys. Occupancy percentages will be certified annually by the <br />City. Current occupancy percentages are shown in Table I. <br /> <br />Study Intersections - The City specifies which intersections are to <br />be included in each study. North Pleasanton has been divided into <br />several traffic zones which are shown in Figure TZ. Traffic <br />conditions at the intersections listed in Table II are required to <br />be analyzed for developments in specific traffic zones. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.