My WebLink
|
Help
|
About
|
Sign Out
RES 84529
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2012 3:10:08 PM
Creation date
1/27/2000 10:53:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/16/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. 84-529 <br /> <br /> RESOLUTION AMENDING RESOLUTION OF INTENTION NO. 84-398 <br /> <br /> NORTH PLEASANTON FIRE PROTECTION ASSESSMENT DISTRICT NO. 1982-6 <br /> The City Council of the City of Pleasanton resolves: <br /> <br /> On August 14, 1984, the City Council adopted Resolution <br />No. 84-398, "Resolution of Intention to Order Improvement in North <br />Pleasanton Fire Protection Assessment District No. 1982-6". <br />Resolution No. 84-398 is hereby amended by deleting therefrom the <br />following: <br /> <br />The construction a fire station designed to house three (3) <br />pieces of first-line fire apparatus and 27 personnel on three <br />shifts, together with necessary offices, storage space, <br />workshop, classroom, exercise room and living quarters, totaling <br />approximately 12,464 square feet, together with all necessary <br />appurtenances, and the acquisition and improvement of a site <br />approximately 1.11 acres in size for the station to be located <br />on the east side of Stoneridge Mall Road north of Stoneridge <br />Drive. <br /> <br />The construction of a Fire Training Facility including a five- <br />story training tower, smoke room and hot-fire room containing <br />approximately 3,000 square feet, together with all necessary <br />appurtenances; and the acquisition and improvement of a site <br />approximately 2.5 acres in size for the training facility. <br /> <br />and substituting therefor: <br /> <br />The construction a fire station designed to house three (3) <br />pieces of first-line fire apparatus and 27 personnel on three <br />shifts, together with necessary offices, storage space, <br />workshop, classroom, exercise room and living quarters, totaling <br />approximately 12,464 square feet, together with all necessary <br />appurtenances, and the acquisition and improvement of a site <br />approximately 1.11 acres in size for the station to be located <br />on the east side of Stoneridge Mall Road north of Stoneridge <br />Drive. <br /> <br />The construction of a Fire Training Facility including a five- <br />story training tower, smoke room and hot-fire room containing <br />approximately 3,000 square feet, together with all necessary <br />appurtenances; and the acquisition and improvement of a site <br />approximately 2.5 acres in size for the training facility. <br /> <br />c. The construction of off-site roadway improvements including <br /> <br />ORIGINAL <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.