Laserfiche WebLink
RESOLUTION NO. 84-529 <br /> <br /> RESOLUTION AMENDING RESOLUTION OF INTENTION NO. 84-398 <br /> <br /> NORTH PLEASANTON FIRE PROTECTION ASSESSMENT DISTRICT NO. 1982-6 <br /> The City Council of the City of Pleasanton resolves: <br /> <br /> On August 14, 1984, the City Council adopted Resolution <br />No. 84-398, "Resolution of Intention to Order Improvement in North <br />Pleasanton Fire Protection Assessment District No. 1982-6". <br />Resolution No. 84-398 is hereby amended by deleting therefrom the <br />following: <br /> <br />The construction a fire station designed to house three (3) <br />pieces of first-line fire apparatus and 27 personnel on three <br />shifts, together with necessary offices, storage space, <br />workshop, classroom, exercise room and living quarters, totaling <br />approximately 12,464 square feet, together with all necessary <br />appurtenances, and the acquisition and improvement of a site <br />approximately 1.11 acres in size for the station to be located <br />on the east side of Stoneridge Mall Road north of Stoneridge <br />Drive. <br /> <br />The construction of a Fire Training Facility including a five- <br />story training tower, smoke room and hot-fire room containing <br />approximately 3,000 square feet, together with all necessary <br />appurtenances; and the acquisition and improvement of a site <br />approximately 2.5 acres in size for the training facility. <br /> <br />and substituting therefor: <br /> <br />The construction a fire station designed to house three (3) <br />pieces of first-line fire apparatus and 27 personnel on three <br />shifts, together with necessary offices, storage space, <br />workshop, classroom, exercise room and living quarters, totaling <br />approximately 12,464 square feet, together with all necessary <br />appurtenances, and the acquisition and improvement of a site <br />approximately 1.11 acres in size for the station to be located <br />on the east side of Stoneridge Mall Road north of Stoneridge <br />Drive. <br /> <br />The construction of a Fire Training Facility including a five- <br />story training tower, smoke room and hot-fire room containing <br />approximately 3,000 square feet, together with all necessary <br />appurtenances; and the acquisition and improvement of a site <br />approximately 2.5 acres in size for the training facility. <br /> <br />c. The construction of off-site roadway improvements including <br /> <br />ORIGINAL <br /> <br /> <br />