Laserfiche WebLink
" 8/22/84 <br /> <br />Task 1 - <br /> <br />Task 2 - <br /> <br /> EXHIBIT I <br /> <br />WORK PLAN FOR PLEASANTON SEWER SYSTEM <br />MASTER PLAN <br /> <br /> Gather Information - Initial meeting with City staff to gather <br /> and discuss the following: <br /> <br />A. Develop objectives of study <br /> <br /> 1. Identify existing and future collection <br /> system deficiencies <br /> <br /> 2. Develop Master Plan for collection system <br /> improvements consistent with implementation <br /> of General Plan <br /> <br /> 3. Prepare capital improvement program with <br /> cost estimates <br /> <br />B. Obtain or review available information including hut <br /> not limited to the following: <br /> <br /> 1. Pleasanton sewer atlas maps <br /> <br /> 2. Pleasanton General Plan and status of <br /> amendments which may affect analysis <br /> <br /> 3. Availability of existing pipeline data <br /> <br /> 4.Known or suspected problem areas <br /> <br /> a. Engineering staff <br /> <br /> b. Operation and maintenance staff <br /> <br />C. Discuss work completed for East Amador Trunk Sewer <br /> analysis and required coordination <br /> <br /> Obtain Existing Pipeline Information <br /> <br />A. From recorded information, for portions of the system <br /> to be modeled obtain the following pipeline data: <br /> <br /> 1. Pipe diameters (probably limited to minimum <br /> of 10 or 12 inch diameter) <br /> <br /> 2. Slopes <br /> <br /> 3. Distances between manholes <br /> <br /> 4. Invert elevations, if slopes not identified <br /> <br /> <br />