My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
060209
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2009 1:37:31 PM
Creation date
5/29/2009 1:35:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/2/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Check cabinet inventory list and update as needed. Provide an electronic copy to the City <br />Traffic Engineering Division <br />In addition to the monthly, quarterly and semi annual maintenance, the Contractor shall conduct <br />Annual Preventative Maintenance and submit a report that shall include all of the following <br />elements. Annual maintenance shall take place in the month of October: <br />15. Controller Cabinet <br />Replace cabinet air filter <br />16. Signal System Assessment <br />Perform conflict monitor test and submit printout <br />Check for water accumulation and reseal ducts <br />17. Miscellaneous <br />Check any other equipment utilized during the term of the Agreement but not specifically <br />listed <br />Anchor bolts tightened <br />18. Night Inspections <br />Walk intersection and check for proper visibility and operation of traffic signal heads, <br />pedestrian signal heads and flashing beacons <br />Check operation of safety lighting and recommend repairs and replacements to City Traffic <br />Engineering Division as needed <br />Check operation of internally illuminated street name signs and conduct repairs and <br />replacements as needed <br />Radar Speed Signs (used in conjunction with traffic signals only) <br />o Check operation of Radar Speed Signs and adjust radar unit alignment as needed <br />o Clean protective sheeting <br />o Check seals and make repairs as needed <br />o Check batteries and replace as needed <br />o Check connections and tighten if needed <br />Traffic Signal Maintenance Contract <br />Attachment 4 Preventative Maintenance Schedule <br />Contract No <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.