Laserfiche WebLink
CIP <br />Midyear Amendments <br />Expansion <br />Fund <br />355,497 <br />Replacement <br />Fund <br />345 <br />Total <br />BEGINNING BALANCE <br />ESTIMATED REVENUES <br />Water Connection Fees <br />(65,940) <br />(65,940) <br />TOTAL FEE REVENUE <br />($65,940) <br />$0 <br />($65,940) <br />TRANSFER TO NEXT YEAR'S REVENUE <br />65,940 <br />65,940 <br />INTEREST INCOME (Including Project Reserves) <br />20,000 <br />100,000 <br />120,000 <br />TOTAL ESTIMATED REVENUES <br />$20,000 <br />$100,000 <br />$120,000 <br />TRANSFERS FROM: <br />Water M &O Fund Replacement Accrual <br />0 <br />Water M &O Fund Debt Payments 2004 Water Revenue Bonds <br />0 <br />Water M &O Fund Polybutylene Repairs <br />0 <br />TRANSFERS TO: <br />Water Debt Service Fund 2004 Bonds <br />0 <br />NET TRANSFERS IN /(OUT) <br />$0 <br />$0 <br />$0 <br />TOTAL FUNDS AVAILABLE <br />$20,000 <br />$100,000 <br />$120,000 <br />Expenditures: <br />011012 <br />Pimlico Dr Turnout Water Transmission Line (Reserve) <br />0 <br />011017 <br />New Standby Power Generator: Water Portion <br />(90,000) <br />(90,000) <br />011022 <br />Chlorine Injection Sites <br />(24,112) <br />(24,112) <br />011023, <br />011024 <br />Vineyard Corridor Infrastructure Imp Phase III Water Tank, Supply Lines, Pump <br />Station <br />86,670 <br />86,670 <br />031010 <br />Electrical Panel Upgrades and Restorations <br />(44,072) <br />(44,072) <br />0 <br />031015 <br />Pressure Reducing Valve Improvements for Hillside Areas <br />051015 <br />SCADA Computer Hardware and Software Upgrade <br />(51,493) <br />(66,871) <br />(51,493) <br />(66,871) <br />051023 <br />McCloud Water Tank Replacement (Refurbishment) <br />061000 <br />Annual Water Quality Improvement Project <br />(125,455) <br />(125,455) <br />061006 <br />Golden Eagle Farms New Water Storage Tank <br />(247,000) <br />(403,000) <br />(650,000) <br />061008 <br />Annual Automated Meter Reading Retrofit <br />250,000 <br />250,000 <br />061010 <br />Electrical Panel Upgrades and Restorations <br />(38,918) <br />(250,320) <br />(38,918) <br />(250,320) <br />061011 <br />Annual Control Valve Installation <br />061013 <br />Annual Replacement of Polybutylene Service Laterals Irrigation Lines <br />0 <br />071022 <br />Bi- Annual Emergency Water Generator Overhaul <br />0 <br />071023 <br />Water Tank Corrosion Repairs <br />0 <br />071028 <br />Annual Water Replacement Projects <br />(214,711) <br />(214,711) <br />071040 <br />Annual Replacement of Water Meters <br />(44,883) <br />(44,883) <br />071041 <br />Water Sewer Asset Management Plan Upgrade <br />0 <br />081000 <br />Bi- Annual Water Quality Improvement Project <br />125,455 <br />125,455 <br />081008 <br />Bi- Annual Automated Meter Reading Retrofit <br />(250,000) <br />(250,000) <br />081010 <br />Bi- Annual Electrical Panel Upgrades and Restorations <br />82,990 <br />82,990 <br />081011 <br />Bi- Annual Control Valve Installation <br />(20,000) <br />(20,000) <br />081013 <br />Bi- Annual Replacement of Polybutylene Service Laterals Irrigation Lines <br />0 <br />081028 <br />Annual Water Replacement Projects <br />(2,569) <br />(2,569) <br />081033 <br />Black Ave Utilities (Balance of project in Sewer CIP and Streets CIP) <br />217,280 <br />217,280 <br />081040 <br />Annual Replacement of Water Meters <br />44,883 <br />44,883 <br />802011 <br />Committee Valley Water Retailers <br />0 <br />941015 <br />Del Valle Parkway Water Main Extension <br />0 <br />971013 <br />Water Connection Fee Update <br />0 <br />971014 <br />Water System Master Plan Update <br />(7,456) <br />(2,485) <br />(9,941) <br />991033 <br />Generator Study (Water Portion) <br />(9,308) <br />(9,308) <br />999999 <br />General Fund Utility Cut Patching (moved from transfers above) <br />49,674 <br />49,674 <br />999999 <br />General Fund CIP Engineering (moved from transfers above) <br />48,111 <br />(47,942) <br />169 <br />TOTAL WATER PROJECTS <br />($206,345) <br />($829,187) <br />($1,035,532) <br />ENDING WATER FUND BALANCE <br />$226,345 <br />$929,187 <br />$1,155,532 <br />FY 08 -09 CAPITAL IMPROVEMENT PROGRAM <br />APPENDIX A <br />note: numbers in italics signify projects already approved by Council A8 <br />