Laserfiche WebLink
Civic Square <br />Community I <br />Affieu3 <br />ytieaH!DVI <br />saanosaa <br />totem <br />y <br />2 <br />2 <br />7. Landscaping <br />Check here if the landscape area is <10% of the total site area. Projects with <10% landscape area can cnly check up to 3 boxes <br />a. No Plant Species will Require Shearing <br />h. No plantings are Listed on the Invasive Plant Inventory by the California Invasive Plant Council <br />c. Specify Drought tolerant California Natives, Mediterranean or Other Appropriate Species <br />d. Create Drought Resistant Soils: <br />in this section. <br />c. Divert 80% or more <br />1 <br />0 a, Lumber is Delivered Pre -Cut from Supplier (80% or More of Total Board Feet) <br />b. Components of the Project Are Pre Assembled OH -Site Delivered to the Project <br />0 <br />i. Mulch All Planting Beds to a Depth of 2 Inches or Greater as Per Local Ordinance <br />2 <br />L <br />1 <br />0 <br />ii. Amend with 1 Inch of Compost or as per Soil Analysis to Reach 3.5% Sail Organic Matter <br />e. Design Install High Efficiency Irrigation System <br />1 <br />1 Specify Smart (Weather- Based) Irrigation Controllers <br />1 <br />ii. Specify Drip, Bubblers or Low -Flow Sprinklers for All Non Tur Landscape Areas <br />C. STRUCTURE <br />1 <br />f. Group Plants by Water Needs (Hydrozones) in Planting Plans Identify Hydrozones on Irrigation Plans <br />g. Minimize Turf in Landscape Installed by builder <br />L <br />1, Do Not Specify Turf on Slopes Exceeding 10% or in Areas Less Than 8 Feet Wide <br />0 a. Minimum 25% Recycled Aggregate (Crushed Concrete) for Fill, Backfill Other Uses <br />L <br />ii, Less Than 33% of All Landscaped Area is Specified as Turf AND All Turf has Water Requirement To Tall Fescue <br />1. <br />8. Building Performance Exceeds Title 24 by at least 15%-Required <br />20% <br />30% or More <br />Enter the Percent Above the 2005 Version of Title 24 for Residential and Non Residential Portions of the Project. <br />15% <br />a. Residences: 2 Points for Every 1% Above 2005 T24 <br />25 <br />7% <br />I b. Non Residential Spaces: 2 Points for Every 1% Above 2005 T24 <br />9. Cool Site <br />a. At least 30% of the Site Includes Cool Site Techniques <br />1 <br />10. Adaptable Buildings <br />a. Include Universal Design Principles in Units <br />50% of Units <br />1 <br />80% of Units <br />1 <br />b. Live/Work Units Include A Dedicated Commercial Entrance <br />1 <br />11. Affordability <br />a A Percentage of Units are Dedicated to Households Making 80% or Less of AMI <br />10% of All Units <br />1 <br />20% <br />1 <br />30% <br />50% or More <br />1 <br />b. Development Includes Multiple Bedroom Units (At least 1 Unit with 3BR or More at or Less Than 80% AMI) <br />2 <br />B. SITEWORK <br />1. Construction Demolition Waste Management <br />Divert a Portion of all Construction Demolition Waste: <br />ossi e'olns <br />y <br />2 <br />2 <br />0 a. Required: Divert 50% <br />0 b. Divert 65% <br />c. Divert 80% or more <br />2. Construction Material Efficiencies <br />1 <br />0 a, Lumber is Delivered Pre -Cut from Supplier (80% or More of Total Board Feet) <br />b. Components of the Project Are Pre Assembled OH -Site Delivered to the Project <br />r <br />2 <br />L <br />0 25% of Total Square Footage <br />50% of Total Square Footage <br />75% of Total Square Footage or More <br />3. Construction Indoor Air Quality (IAQ) Management Plan <br />a. An IAQ Management Plan is Written Followed for the Project <br />2 <br />C. STRUCTURE <br />Possible Points <br />1. Recycled Aggregate <br />1 <br />0 a. Minimum 25% Recycled Aggregate (Crushed Concrete) for Fill, Backfill Other Uses <br />2. Recycled Flyash in Concrete <br />a. Flyash or Slag is Used to Displace a Portion of Portland Cement in Concrete <br />1 <br />1 <br />20% <br />30% or More <br />MF GreenPoint Checklist <br />2005 Edition v.2 <br />Page 3 of 8 <br />