Laserfiche WebLink
PU D- 84- 21 -04M <br />Exhibit A, Conditions of Approval <br />Addition to the Civic Square Apartment Development <br />4800 Bernal Avenue <br />May 19, 2009 <br />Project Specific Conditions: <br />1. The 12 -unit, 3- building addition and remodeling including site changes, <br />landscaping, buildings, etc., covered by this approval shall be constructed <br />substantially as shown on the development plans, Exhibit B, on file with the <br />Planning Department, except as modified by the following conditions. Exhibit B <br />for PUD- 84- 21 -04M, dated "Received March 11, 2009" includes: "Administration <br />Clubhouse Building Floor Plans and Elevations `Apartment Building Floor Plans <br />and Elevations "Focused Site, Landscaping, and Tree Removal Plans "Overall <br />Site Plan and "Materials and Color Samples Minor changes to the <br />development plan may be allowed subject to the approval of the Planning <br />Division if found to be in substantial conformance to the approved exhibits. <br />All conditions of approval for this development plan shall be reprinted and <br />included as a plan sheet(s) with the building permit plan check sets including <br />grading, construction, and landscaping plans, which shall be kept on the project <br />site at all times. The applicant may request these conditions of approval be <br />attached to the plan set as a separate document which he /she is responsible for <br />obtaining and ensuring the conditions are securely attached. Prior approval from <br />the Planning Division is required before any changes are constituted in site <br />design, grading, etc. It is the responsibility of the project developer to ensure that <br />the project contractors are aware of, and abide by, the approved plans and all <br />conditions of approval. <br />The applicant shall reroof an existing mailbox structure and repair the chain link <br />fencing on the south property line adjoining the rail corridor before the first final <br />inspection. <br />Construction Measures <br />All demolition and construction activities, inspections, plan checking, material <br />delivery, staff assignment or coordination, etc., shall be limited to the hours of <br />8:00 a.m. to 5:00 p.m., Monday through Friday. No construction shall be allowed <br />on State or Federal Holidays or Sundays. All construction equipment must meet <br />Department of Motor Vehicles (DMV) noise standards and shall be equipped with <br />muffling devices. Prior to the start of construction, the applicant shall post on the <br />site the allowable hours of construction activity. <br />Page 1 of 7 <br />