Laserfiche WebLink
PART B <br />AN ESTIMATE OF THE COST OF THE MAINTENANCE <br />2009 -2010 <br />LIGHTING AND LANDSCAPE MAINTENANCE DISTRICT <br />NO. 1993 -2, BONDE RANCH <br />CITY OF PLEASANTON <br />A. Intensely Landscaped Areas (maintenance): <br />1. Independence Drive (107,400 sq. ft.) <br />2. Livingston Way (20,500 sq. ft.) <br />total area 127,900 sq. ft $7,715.00 <br />B. Water $3,130.00 <br />C. Power <br />1. Five Irrigation Controllers $540.00 <br />D. Fuel Transition Zone (Firebreak) 287,000 sq. ft. <br />1. Weed Abatement $8,400.00 <br />2. Fence Repair $3,000.00 <br />E. Street Lights <br />1. Re- lamping $440.00 <br />F. Reserve /Long -Term Replacement Fund for scheduled long -term <br />replacement of various district improvements (see note). $1,524.73 <br />G. City of Pleasanton Administration $1,300.00 <br />SUBTOTAL $26,049.73 <br />County Fees for Collection of Assessments $439.62 <br />GRAND TOTAL $26,489.35 <br />Assessment per Unit (102 units) $257.22 per year <br />1 unit $252.91 (City parcel) <br />Note: <br />An existing surplus of approximately $32,000 exists for Lighting and Landscape Maintenance <br />District 1993 -2, Bonde Ranch. These funds are held in an interest bearing account until needed <br />for repairs to the landscaping, irrigation systems, fencing or other District features. <br />4 <br />