Laserfiche WebLink
PART B <br />AN ESTIMATE OF THE COST OF THE MAINTENANCE <br />2009 -2010 <br />LIGHTING AND LANDSCAPE MAINTENANCE DISTRICT <br />NO. 1993 -1 WINDSOR <br />CITY OF PLEASANTON <br />A. Landscaping (maintenance): <br />1. Tapestry Way Area A (60,315 sq. ft.) <br />2. Creekside Area B (24,673 sq. ft.) <br />3. Entry Creekside Area C (16,307 sq. ft.) <br />total area 101,295 sq. ft. $11,700.00 <br />B. Water <br />1. All Planting $5,500.00 <br />C. Power <br />1. 2 Controllers ($18 per month) $216.00 <br />D. Reserve /Long -Term Replacement Fund for scheduled long -term <br />replacement of various district improvements (see note) $5,143.90 <br />E. City of Pleasanton Administration Fee $1,300.00 <br />SUBTOTAL $23,859.90 <br />County Fees for Collection of Assessments $405.90 <br />GRAND TOTAL $24,265.80 <br />Assessment per Unit (90 units) $269.62 per year <br />Note: <br />An existing surplus of only approximately $7,400 currently exists for Lighting and Landscape <br />Maintenance District 1993 -1, Windsor, as a significant re- landscaping and irrigation renovation <br />project was undertaken in 2006. Reserve /replacement funds will be held in an interest bearing <br />account until needed for future repairs or replacement of entry walls, signage, irrigation systems, <br />landscaping or other District features. <br />4 <br />