My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
051909
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2009 2:40:52 PM
Creation date
5/13/2009 4:49:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/19/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dowling Associates, Inc. <br />Transportation Engineering Planning Research Education <br />SCOPE OF WORK <br />ATTACHMENT 3 <br />This section presents an outline of our proposed work plan for technical and professional services pertaining <br />to the refinement, validation, application and training for the transportation model. We have developed a <br />simple approach based on our many years of modeling experience, and believe that this plan will meet all of <br />the City's goals for this study. Please note that while all of the work scope items identified in the City's RFP <br />are included herein, they may have been reorganized to tit our methodology and approach. <br />In summary, the Dowling Associates team will act as on -call consultants with the goal of providing high <br />quality, cost effective responses to request for technical modeling support. <br />TASK 1 MODEL UPDATE <br />1.1 KICK -OFF MEETING <br />Dowling Associates will consult with City staff to discuss model update issues and then will prepare a draft <br />model methodology working paper for review by the City. The working paper will address the following <br />issues: <br />Recommended changes to the model road network, inside and outside the City of Pleasanton. <br />Recommended changes to the zone system and zone connectors. <br />Land use categories and trip generation rates, most likely based on ITL Trip Generation (convert to <br />variable equations vs. single average rates). <br />Required level of interface with the City of Livermore, City of Dublin, Alameda County Congestion <br />Management Agency (CMA), Contra Costa Transportation Authority (CCTA), and the MCC regional <br />travel demand models (e.g., where will Livermore and Dublin trips come from) <br />Procedure for analysis of non -auto and transit modes (e.g., most likely a factoring process based on <br />origin destination data by travel mode from the MTC model). <br />Appropriate forecast years for approved (2015?) and buildout (2035 <br />Peak spreading needs. <br />Procedure for development of intersection volumes (counts, Furness adjustments. etc.). <br />Model validation criteria and screenlines, including commute patterns and cut- through traffic. <br />Advantages and disadvantages of using a base year matrix estimation process that fits trips to traffic <br />counts <br />The model methodology working paper and associated maps will be modified in response to comments by <br />City staff. <br />1.2 COLLECTION AND REVIEW OF EXISTING DATA <br />Current Documents <br />Dowling Associates will work with City staff to ensure that we have knowledge of any documents or studies <br />occurring in the Tri- Valley region which may provide valuable information for the 2009 model update <br />process. Dowling Associates will summarize assumptions and identify any conflicting information. <br />City of Pleasanton 2 <br />2009 Traffic Model Update May 13, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.