My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
050509
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2009 11:37:09 AM
Creation date
5/1/2009 11:36:10 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/5/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water <br />facility. <br />A cooperative effort of <br />the City of (ivennore, the City of Pleasnnron, <br />Dublin Snn Harnon Services Dlstna, <br />and the ~-alifornin Water Servire Company <br />Message: Avery serious problem has occurred and we are unable to <br />deliver sufficient water for human consumption, sanitation and/or fire <br />protection. <br />• Type: Mandatory in designated areas. <br />• Expected Reduction: Varies by area in response to specific situation. <br />CONSERVATION <br />Included below is a list of conservation measures that the Retailers may <br />implement under the Normal Supply condition, and during each stage of <br />conservation to achieve the reduction goal desired. While retailers are not <br />expected to implement identical conservation measures, adopting similar <br />measures will help to maintain a general balance of water conserving impacts <br />and measures across the Tri-Valley. <br />Water Conservation Measures Expected Of Our Customers <br />The Plan includes the recommended conservation measures to be <br />implemented at each stage. The conservation measures within each stage are <br />additive in that each stage includes all of the conservation measures of the <br />previous stages. For example, Stage 1 includes all activities listed under <br />Normal as well as Stage 1; Stage 2 includes all activities listed under Normal, <br />Stage 1 and Stage 2; and so on. Also, in an emergency, agencies have the <br />authority to implement any or all of the measures detailed in this plan. <br />Conservation Measure Normal <br />1 2~ 3 ~ 4 <br />ndscape Irrigation (SFR, MFR, CII)* <br />Shut-off nozzles; no runoff, over spray, or X X X X X <br />saturation of landscape <br />--- - <br />Sprinklers 9 p.m. to 6 a.m.; train/educate <br />regarding water conserving irrigation systems X <br />and dry climate plants <br />
The URL can be used to link to this page
Your browser does not support the video tag.