My WebLink
|
Help
|
About
|
Sign Out
WORKSHOP ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
042809
>
WORKSHOP ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 9:34:22 AM
Creation date
4/24/2009 10:48:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/28/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
WORK ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />City Council Work Plan for 2009/2010 (with NEW additions) <br />JHCCKCMcGMSJTTotalAVG <br />GoalsProject DescriptionResponsible Status <br />Department <br />TRAFFIC <br />Implement improved traffic circulation measures <br />BART to Livermore The City of Pleasanton currently supports the I-580 alignment to CDDUnderway. <br />11130.6 <br />Greenville Road. <br />Development of principles and guidelines for improved traffic Develop principles and guidelines to allow for the implementation of CDDPending completion of the General Plan. Signal coordination <br />work <br />111140.8 <br />circulationimproved circulation throughout the City. The Traffic Circulation is ongoing. The draft Bike and Pedestrian Master Plan is <br />Element will be used as a framework for implementation, including underway and should be completed by spring 2009. <br />but not limited to, local and regional infrastructure improvements, <br />signal timing, best practices, the bike and pedestrian master plan <br />and other related initiatives. <br />(NEW) In addition: <br />intersections that have the potential to exceed level of service <br />D. <br />lights. Continue to coordinate and synchronize computer- <br />controlled traffic signals on major city streets. <br />conduct appropriate outreach with neighborhoods. <br />the school's traffic-calming and shared-parking solutions in <br />the Rides-to-School Program. <br />Support State and regional efforts to improve State Route 84 <br />(NEW) State Route 84CDD <br />including the widening to four lanes between Pigeon Pass and I- <br />680. <br />Continue to monitor regional rail and high-speed rail plans and <br />(NEW) High Speed RailCDD <br />consider impacts on and benefits for Pleasanton. <br />Prepare and adopt a citywide pedestrian and bicycle master plan. <br />(NEW) Ped/Bike Master PlanCDD <br />Identify areas where additional bicycle parking facilities are <br />needed. <br />Coordinate the design and construction of El Charro Road / I-580 <br />(NEW) El Charro Road / I-580 InterchangeCDD <br />interchange improvements with Livermore, Dublin, and Alameda <br />County. <br />Actively participate with the Alameda County Congestion <br />(NEW) Regional TransportationCDD <br />Management Agency, the Metropolitan Transportation <br />Commission, and the Tri-Valley Transportation Council to develop <br />and implement regional transportation plans and systems which <br />benefit Pleasanton and the Tri-Valley. <br />attch 1 Priority Ranking with NEW Priorities.xls Adopted 2/20/07Page 6 of 17 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.