Laserfiche WebLink
Attachment 1 <br />City Council Work Plan for 2009/2010 (with NEW additions) <br />JHCCKCMcGMSJTTotalAVG <br />GoalsProject DescriptionResponsible Status <br />Department <br />Energy/Water/Air Quality <br />Photovoltaic ProjectPursue a public or private partnership for a photovoltaic project.CMO / Operations Pursing Photovoltaic at OSC. <br />1111151 <br />Services <br />Community Choice Aggregation (AB 117) Review final Feasibility Study. If approved by Council, develop CMOThe original Community Choice Aggregation Feasibility Study was <br />1120.4 <br />Implementation Plan as prescribed by CPUC.completed in 2005 by Navigant Consulting. Since then changes <br />in the PG&E rate structure, escalating energy costs and <br />increased cost for renewable generation have made the original <br />assumptions outdated. Navigant has provided updated <br />information and staff is researching CCA projects in other <br />jurisdictions. Staff anticipates that next steps will be determined <br />by 2009. <br />Develop a comprehensive program to reduce City government <br />(NEW) Energy Consumption PlanOperation Services <br />energy consumption. <br />Continue to work with the Cities of Livermore and Dublin to develop <br />(NEW) Solar Cities ProgramOperation Services <br />a solar cities program or standardized solar-energy-system <br />installation designs for residences and potentially for businesses. <br />Encourage the use of fuel-efficient buses within the City. <br />(NEW) Fuel-Efficient Buses (City and LAVTA)Operation Services <br />Encourage the construction of infrastructure for and use of <br />(NEW) Fuel Efficient InfrastructureCDD <br />alternative fuel vehicles. <br />When replacing or adding motor vehicles to the City fleet, <br />(NEW) City Fleet PolicyOperation Services <br />maximize the percentage of hybrid or other low-fuel usage, low- <br />emission vehicles, as reasonable and feasible. <br />Continue working with the Dublin-San Ramon Services District <br />(NEW) DSRSD Treatment PlantOperation Services <br />(DSRSD) to ensure that odors from the sewage treatment plant are <br />minimized and other air emissions meet all regulatory <br />requirements. <br />Support Zone 7 Water Agency in water supply production, <br />(NEW) Water Supply Operation Services <br />treatment, and procurement practices that do not negatively impact <br />the environment. <br />Work with Zone 7 to develop water conservation plans and <br />(NEW) Water Conservation StrategiesOperation Services <br />strategies for the long term. <br />Develop a contingency plan for potential water shortages including <br />(NEW) Water Contingency PlanOperation Services <br />groundwater management and water conservation. <br />During construction or reconstruction of public facilities, institute <br />(NEW) Water Efficient Standards - Public FacilitiesOperation Services <br />water conservation measures such as hot-on-demand water <br />faucets, low-flush toilets, low water-using appliances, and low water- <br />using irrigation devices and/or water-conserving landscaping. <br />Encourage water retailers to continue to work with Zone 7 on water <br />(NEW) Water Retailers AssociationOperation Services <br />conservation and quality issues. <br />Support Zone 7's efforts to improve the drainage system in <br />(NEW) Stream Management Master PlanOperation Services <br />conformance with its Stream Management Master Plan for the <br />Planning Area in order to remove properties from flood hazard <br />zones. <br />Support State and federal legislation that promotes improvements <br />(NEW) Air QualityOperation Services <br />in air quality <br />attch 1 Priority Ranking with NEW Priorities.xls Adopted 2/20/07Page 16 of 17 <br /> <br />