My WebLink
|
Help
|
About
|
Sign Out
WORKSHOP ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
042809
>
WORKSHOP ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 9:34:22 AM
Creation date
4/24/2009 10:48:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/28/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
WORK ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />City Council Work Plan for 2009/2010 (with NEW additions) <br />JHCCKCMcGMSJTTotalAVG <br />GoalsProject DescriptionResponsible Status <br />Department <br />Downtown <br />Firehouse Arts Center: Fire Station 4 (Railroad Ave.) Conversion Construction of Performing Arts CenterCMO Construction began in August 2008 with completion anticipated <br />11130.6 <br />in early 2010. <br />Historic Preservation OrdinanceComplete the ordinance consistent with the Downtown Specific CDDPending completion of General Plan update. <br />111140.8 <br />Plan. <br />Conduct various community workshops to outreach with the CMO/ED/CDDPending completion of General Plan update. <br />Downtown Specific Plan Implementation and Outreach111140.8 <br />community about established specific plan guidelines and <br />objectives, collect input and determine whether changes are <br />necessary through an amended Specific Plan process. <br />Lions Wayside and Delucci Park RedevelopmentDesign and renovate the two parks consistent with the Downtown Parks & CSRichard Larson Associates has been selected to complete the <br />11130.6 <br />Specific Plan and Downtown Trails Plan. The renovation will design services. <br />compliment the new Firehouse Arts Center. <br />Permanent ACE Train LocationInitiate a permanent solution to the ACE Train location. Current Econ Dev'tUnderway. Staff will continue to work to identify a permanent <br />111140.8 <br />station location is considered a temporary site.solution for the project and identify funding. <br />Right to Operations Ordinance Work with the Pleasanton Downtown Association and the CDDPending completion of the General Plan update. <br />11130.6 <br />Economic Vitality Committee to study this concept for the <br />Downtown. <br />In the Downtown, encourage mixed-use development which CDD <br />(NEW) Encourage Downtown Mixed Use <br />incorporates higher density and affordable residential units <br />consistent with the Downtown Specific Plan. <br />Develop the Downtown section of the Transportation Corridor with <br />(NEW) Design and Construction of Downtown Parking CMO/CDD <br />parking, a pedestrian and bicycle trail, and landscaping. <br />Improve the major gateways into the Downtown to create a sense <br />(NEW) Downtown GatewaysCDD <br />of arrival and to enhance the aesthetics along these roadways, as <br />described in the Downtown Specific Plan. <br />Design and install downtown directional signs at major entryways to <br />(NEW) Downtown Directional SignageOperation Services <br />the City. <br />(NEW) PDA Priorities <br /> Campaigns <br />attch 1 Priority Ranking with NEW Priorities.xls Adopted 2/20/07Page 14 of 17 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.