My WebLink
|
Help
|
About
|
Sign Out
13 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
042109
>
13 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2009 4:29:17 PM
Creation date
4/15/2009 2:42:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/21/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
13 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' -28. That the following water conservi:: ~:L~.mib~.nf; ii.xtures be <br />installed: a) low flush water closets; b) sho:cer flow <br />control heads; c) aerators in i-~terior ~`ancete, and <br />d) insulation of hot water linos. <br />29. That the developer's contractor obtain an encroachment <br />permit from the City prior to the beginning of con- <br />struction. <br />3 0. That the developer pay any and all fees that the <br />property may be subject to. <br />31. That approvaal of the design for line, grade and <br />structural sections for the streets serving this <br />development be withheld pending final design. <br />32. That the median in Valley Avenue be 16 feet wide curb <br />to curb. <br />33. That the developer's engineer submit preliminary design <br />calculations, criteria, and assumptions in bound, <br />8-1/2" x 11" or 8-1/2" x 14" format which set forth the <br />basis for design for the sewer, water, and storm drain <br />systems as well as relevant information concerning soils, <br />traffic, etc. <br />34, That approval of the water distribution system be <br />withheld pending final design and subsequent approval <br />by the City Engineer. <br />35. That the developer install the 20" water line from the <br />existing termination on Valley Avenue to Kolln Street. <br />36• That approval of the sanitary sewer collection system <br />be withheld pending final design and subsequent approval <br />by the City Engineer. <br />37. That the developer design and install the off-site <br />sanitary. sewer line to the Jensen lift station and make <br />whatever revisions may be required to the Jensen station <br />and the outfall system. These plans shall be approved <br />by the City Engineer. <br />3& That the sanitary sewer system be designed and sized to <br />adequately serve the drainage area tributary to it. <br />39. That approval of the storm drainage system be withheld <br />pending final design and subsequent approval by the <br />City Engineer. <br />44 That the storm drainage system be designed and sized to <br />adequately serve the drainage area tributary to it. <br />41 That all applicable requirements of the Alameda County <br />Flood Control District be met. <br />Fthihit (' <br />
The URL can be used to link to this page
Your browser does not support the video tag.