My WebLink
|
Help
|
About
|
Sign Out
12 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
042109
>
12 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2009 2:33:03 PM
Creation date
4/15/2009 2:33:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/21/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
12 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and believes that the bio-retention pond will take care of the extra water coming down. <br />He noted, however, that the water coming down the creek prior to Mr. Smith moving <br />there. He concluded that he believes his project will have less traffic and the same <br />amount of water. <br />THE PUBLIC HEARING WAS CLOSED. <br />Commissioner O'Connor stated that developers pay mitigation fees, part of which is for <br />traffic. He noted that the area is somewhat unique in that part of it is in the County and <br />part in the City. He inquired if money received for mitigation goes toward the County <br />road system. <br />Ms. Seto replied that monies do not go toward the County road system because these <br />are for projects already set forth in the City's development impact fee study, and none of <br />these projects are in the County area. <br />With respect to the issue that water was coming down from another development and <br />crossing the road, Commissioner O'Connor inquired if there were stipulations that water <br />must be controlled from the development such that it does not impact adjacent property. <br />He further inquired if the City could return to developers after the project is completed to <br />have them address and fix water problems. <br />Ms. Seto replied that generally this could be done; however, this would be a private civil <br />matter between the downstream and upstream residents, which only usually takes <br />effect if the upstream residents are concentrating the water flow or changing the <br />patterns of water flow. She noted that as long as the new homes being built are <br />expected to flow their storm water from the roof gutters into the storm drain line in the <br />street and have that gravity flow and other sheet flow existing on the site remain in that <br />channel, it could potentially be argued that there is not significant change to the water <br />patterns because the new impervious surface created should be draining into the storm <br />drain in the street.. <br />Commissioner O'Connor stated that he believed it is the City's responsibility to control <br />water and inquired if it was still within the conditions of approval to require control of <br />water drainage if the City had not engineered it properly. <br />Mr. Jost stated that the City basically puts catch basins on curb returns which is the last <br />point before entering Happy Valley Road. He explained that the basins try to catch all <br />water in the gutter at that point so that none goes across Happy Valley Road. He noted <br />that if the catch basin is within 50 feet of the intersection, there is a chance that the <br />water will not get captured and flow across the street. He added that staff is limited with <br />respect to what can be done in the area because it is a County road the project roads <br />are tying into, and the County has its own standards and design requirements. He <br />noted that this is the first time he has heard about this complaint and that he would look <br />into the matter. He stated, however, that the subdivision improvements have been <br />accepted a while ago. <br />EXCERPTS: PLANNING COMMISSION MINUTES, January 14, 2009 Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.