Laserfiche WebLink
shall install a backflow devise on the domestic water service to house on which the well <br />serves. <br />51. All subdrains shall have cleanout installed at the beginning of the pipe. The bottom of <br />the pipe shall terminate in a storm drain or other storm drain outfall; subject the approval <br />of the City Engineer. The applicant's engineer shall submit a final subdrains location <br />map to the City Engineer prior to acceptance of the Public Improvements. It shall be the <br />responsibility of the homeowner to relocate the subdrains, if during the excavation of a <br />pool or other subsurface structure the subdrains are encountered. All owners within the <br />subdivision shall receive notice of the presents of these subdrains. The City Attorney <br />shall approve said notice. <br />52. The project developer shall deposit a labor and materials and performance bond with <br />the City of Pleasanton to ensure completion of any required public improvements. This <br />bond shall be in a standard form approved by the City Attorney and shall be in an <br />amount satisfactory to the City Engineer. <br />53. The project developer shall submit a final grading and drainage plan prepared by a <br />licensed civil engineer depicting all final grades, pad and finished floor elevations, and <br />on-site drainage control measures. This plan shall be subject to the review and <br />approval of the City Engineer, Director of Community Development, and Chief Building <br />Official prior to the issuance of any building permits. <br />54. The project developer shall submit a refundable cash bond for hazard and erosion <br />control prior to issuance of an Engineering or Building Department permit. The amount <br />of this bond will be determined by the City Engineer. <br />55. The haul route for all materials to and from this development shall be approved by the <br />City Engineer prior to the issuance of an encroachment permit. <br />56. The project developer shall submit a dust control plan or procedure as part of the <br />improvement plans. <br />57. The design of the water supply and sanitary sewer systems shall be subject to the <br />review and approval of the City Engineer. <br />58. Approval of the storm drainage system shall be subject to the review and approval of <br />the City Engineer that the system is adequate, connects to an approved point of <br />discharge, meets any and all applicable requirements of the Alameda County Flood <br />Control District -Zone 7, meets any and all applicable requirements of the Federal <br />Emergency Management Flood Hazard Program, and meets the immediate and long- <br />range requirements of this development. <br />59. The project developer shall submit detailed landscape and irrigation plans as part of the <br />improvement plans. These plans should include, where applicable, a street tree <br />8 <br />