My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
040709
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2009 4:38:42 PM
Creation date
4/1/2009 4:36:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/7/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for Consultant Services <br />Pleasanton Aquatic Center Renovation Phase III <br />Page 3 of 12 <br />3.2.2 CONSULTANT shall provide CLIENT with building and <br />infrastructure requirements, including design criteria, as <br />needed to service the swimming pool equipment, including: <br />l Swimming pool equipment room dimensions. <br />2 Sanitary/storrri sewer requirements and points of <br />connection. <br />3 Domestic water requirements and points of <br />connection. <br />.4 Natural gas requirements and points of connection. <br />.5 HVAC requirements for swimming pool equipment. <br />.6 Electrical requirements and points of connection for <br />swimming pool equipment. <br />.7 Swimming pool decks and appurtenances details <br />3.2.3 CONSULTANT shall advise CLIENT of any adjustments to the <br />estimate of probable construction cost. <br />3.3 Construction Documents Phase: <br />3.3.1 Based upon the approved Design Development Documents <br />and any further adjustments in the scope or quality of the <br />Project or in the construction budget authorized by CLIENT, <br />CONSULTANT shall prepare, for approval by CLIENT, <br />Construction Documents consisting of Drawings and <br />Specifications setting forth in detail the requirements for <br />construction of the swimming pools. Construction <br />Documents Phase deliverables shall include the following: <br />Architectural Drawings: <br />• Swimming pool plan views. <br />• Swimming pool longitudinal and cross-sections. <br />• Swimming pool finish details. <br />Swimming pool rail goods /competitive <br />equipment details. <br />• Swimming pool decks and appurtenances details <br />2 Structural Drawings: <br />
The URL can be used to link to this page
Your browser does not support the video tag.