Laserfiche WebLink
2.0 Current Projects: <br />2.1 <br />Cameron Park Community Center- Cameron Park California <br />Programming, planning, construction documents and construction observation as <br />required for the construction of a 25 yard x 25 meter swimming pool and a 3,900 <br />square foot recreation pool with waterslide and wet play area for the City of <br />Carmeron Park. <br />Completion Date: Spring 2008 <br />Budget: $1,800,000 (aquatics component) <br />Contact: Mr. Max Medina <br />WLC Architects <br />1110 Iron Point Road, Ste 200 <br />Folsom, CA 95630 <br />(916)355-9922 <br />2.2 <br />2.3 <br />Madras Aquatic Center- Madras Oregon <br />Programming, planning, construction documents and construction observation as <br />required for the construction of a 6-8 lane indoor competition /lap pool, an indoor <br />leisure pool and indoor spa for the City of Madras. <br />Completion Date: Spring 2008 <br />Budget: $1,700,000 (aquatics component) <br />Contact: Mr. Jason Miller <br />Opsis Architecture, LLP <br />920 NW 17th Avenue <br />Portland, OR 97209 <br />(503) 525-9511 <br />Allan Witt Aquatics Commix- Fairfield. California <br />Programming, planning, construction documents and construction observation as <br />required for the construction of a 5,000 square foot indoor swimming pool, wet-play <br />area and dual flume slide with receiving pool for the City of Fairfield. <br />Completion Date: Summer 2008 <br />Budget: $2,300,000 (aquatics component) <br />Contact: Mr. Kelly Reynolds <br />Stafford King Wiese Architects <br />622 20th Street <br />Sacramento, CA 95814 <br />AQUATIC DESIGN GROUP <br />