My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
040709
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2009 4:38:42 PM
Creation date
4/1/2009 4:36:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/7/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPRESENTATIVE PROJECTS <br />I.0 Completed Projects: <br />I.I Walter Graham Aquatic Center at Three Oaks Park- Vacaville. California <br />Programming, planning, construction documents and construction observation as <br />required for the construction of: a 25 yard x 25 meter competition pool, waterslide <br />and waterslide receiving pool; and a new interactive water play area for the City of <br />Vacaville. <br />Completion Date: Spring 2002 <br />Construction Cost: $2,400,000 <br />Contact: Mr. Doug DeFabio <br />City of Vacaville <br />40 Eldridge Avenue, Suite 14 <br />Vacaville, CA 95688 <br />(707) 469-6670 <br />1.2 Redding Aquatic Center- Redding. California <br />Programming, planning, construction documents and construction observation as <br />required for the construction of a 25 yard x 50 meter swimming pool, as well as a <br />6,000 square foot activity pool with waterslide, six (6) 25 yard lap swim lanes and <br />wet play structure with zero-depth entry for the City of Redding. <br />Completion Date: Spring 2003 <br />Construction Cost: $2,220,000 <br />Contact: Mr. Gordon Carpenter <br />City of Redding <br />1250 Parkview Avenue <br />Redding, CA 96049 <br />(530) 225-4095 <br />1.3 Ventura Community Park- Ventur_~California <br />Programming, planning, construction documents and construction observation as <br />required for the construction of a 25 yard x 50 meter swimming pool, and an 8,570 <br />square foot activity pool with 25 yard lap swim lanes, waterslide, wet play structure <br />and zero-depth entry for the City of Ventura. <br />Completion Date: Fall 2005 <br />Construction Estimate: $2,680,430.01 (aquatics component) <br />AQUATIC DESIGN GROUP <br />
The URL can be used to link to this page
Your browser does not support the video tag.