My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
040709
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2009 11:56:12 AM
Creation date
4/1/2009 11:56:12 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/7/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF 6 <br />-° ~ °• '° =~=~ "" CITY COUNCIL AGENDA REPORT <br />~'L~~S~NTON® <br />April 7, 2009 <br />Community Development <br />Engineering Division <br />TITLE: ACCEPTANCE OF PUBLIC IMPROVEMENTS PERFORMED BY <br />PRECISION ENGINEERING INC. FOR THE BLACK AVENUE UTILITY <br />PROJECT, CIP NO. 081033 <br />SUMMARY <br />The subject project consisted of installing a new 16" ductile iron pipe water main and <br />repairing a 12" sanitary sewer main along Black Avenue between Hopyard Road and <br />Crestline Avenue. It also included a trench failure repair along Black Avenue between <br />Loganberry and Greenwood. An 8" sanitary sewer main was also repaired in the <br />parking area fronting Nordstrom in the Stoneridge Shopping Center. The subject <br />project is complete and ready for acceptance by the City Council. <br />RECOMMENDATION <br />1. Accept the improvements for this project. <br />2. Authorize the City Clerk to file a Notice of Completion for the subject project. <br />3. Authorize payment of the retention in the amount of $32,443.58 to Precision <br />Engineering Inc. thirty days after recordation of the Notice of Completion. <br />4. Authorize the transfer of the remaining funds as follows: <br />$23,312.33 into Annual Water Replacement, CIP 081028; <br />$10,213.83 into Annual Sanitary Sewer Main Replacement and <br />Improvement, CIP 082002; <br />$20,835.83 into Annual Resurfacing of Various Streets, CIP 085003. <br />FINANCIAL STATEMENT <br />This project replaced and upgraded existing infrastructure and should decrease on- <br />going maintenance costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.