My WebLink
|
Help
|
About
|
Sign Out
ORD 1988
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:47 PM
Creation date
3/6/2009 1:52:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
3/3/2009
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 1988
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
hay bales, sandbags, and siltation fences and are subject to the review and <br />approval of the City Engineer/Chief Building Official. If no grading plan is <br />required, necessary erosion control/storm water quality measures shall be <br />shown on the site plan submitted for an on-site permit, subject to the review <br />and approval of the Chief Building Official. The project developer is <br />responsible for ensuring that the contractor is aware of and implements <br />such measures; <br />b) All cut and fill slopes shall be re-vegetated and stabilized after completion of <br />grading, but in no case later than October 15. Hydroseeding shall be <br />accomplished before September 15 and irrigated with a temporary irrigation <br />system to ensure that the grasses are established before October 15. No <br />grading shall occur between October 15 and April 15 unless approved <br />erosion control/storm water quality measures are in place, subject to the <br />approval of City Engineer/Chief Building Official. Such measures shall be <br />maintained until such time as permanent landscaping is place; <br />c) Gather all construction debris on a regular basis and place it in a dumpster <br />or other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution; <br />d) Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom sweep <br />the street pavement adjoining the project site on a daily basis. Scrape <br />caked-on mud and dirt from these areas before sweeping; <br />e) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any <br />debris or dirt flowing in the storm drain system. Maintain and/or replace <br />filter materials to ensure effectiveness and to prevent street flooding; <br />f) Create a contained and covered area on the site for the storage of bags, <br />cement, paints, oils, fertilizers, pesticides, or other materials used on the <br />site that have the potential of being discharged into the storm drain system <br />through being windblown or in the event of a material spill; <br />g) Never clean machinery, equipment, tools, brushes, or rinse containers into a <br />street, gutter, or storm drain; and <br />h) Ensure that concrete/gunite supply trucks or concrete/plaster operations do <br />not discharge wash water into street, gutters, or storm drains. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.