My WebLink
|
Help
|
About
|
Sign Out
ORD 1988
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:47 PM
Creation date
3/6/2009 1:52:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
3/3/2009
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 1988
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40. The project developer acknowledges that the City of Pleasanton does not <br />guarantee the availability of sufficient sewer capacity to serve this development <br />by the approval of this case, and that the project developer agrees and <br />acknowledges that building permit approval may be withheld if sewer capacity is <br />found by the City not to be available. <br />41. This approval does not guarantee the availability of sufficient water to serve the <br />project. The City shall withhold building permits for the project if at the time <br />building permits are applied for, mandatory water rationing is in effect, unless the <br />City has adopted a water offset program and unless the project developer is <br />participating in the program. Notwithstanding the project developer's participation <br />in such a program, the City may withhold building permits if the City determines <br />that sufficient water is not available at the time of application of building permits. <br />42. All exterior lighting including landscape lighting shall be directed downward and <br />designed or shielded so as to not shine onto neighboring properties. The <br />project/building developer shall submit a final lighting plan, and include drawings <br />and/or manufacture's specification sheets showing the size and types light <br />fixtures proposed for the exterior of the buildings. The light fixtures and their <br />locations shall be subject to the review and approval of the Planning Division. <br />BUILDING AND SAFETY DIVISION <br />43. The project developer shall obtain a building permit from the Building and Safety <br />Division and any other applicable City permits for the project prior to the <br />commencement of any construction. <br />44. The project developer shall pay any and all fees to which the project may be <br />subject to prior to issuance of a building permit. The type and amount of the fees <br />shall be those in effect at the time the building permit is issued. <br />45. The building permit plan check materials will be accepted for submittal only after <br />the ordinance approving the PUD development plan becomes effective, unless <br />the project developer submits a signed statement acknowledging that the plan <br />check fees may be forfeited in the event that the ordinance is overturned or that <br />the design is significantly changed. In no case will a building permit be issued <br />prior to the effective date of the ordinance. <br />46. All structures covered by this approval shall be constructed to: <br />a) Meet Title 24 state energy requirements, and <br />b) Comply with all codes and ordinances in effect before the Building and <br />Safety Division will issue permits. <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.