Laserfiche WebLink
20. Plans for the emergency vehicle access (EVA) road and related improvements at <br />3377 and 3380 Sandstone Court and at the City's Operations Service Center <br />shall be submitted for review and approval by the Director of Community <br />Development and Fire Chief with the subdivision improvement plans. <br />21. An approximately seven-foot tall solid painted metal gate without pedestrian <br />access shall be provided at the Sandstone Court and City Operation Service <br />Center EVAs. Unless otherwise approved by the Director of Community <br />Development, the gate shall match the design of the EVA gate at the end of <br />Madsen Court in the adjacent Ironwood development. <br />22. Prior to City acceptance of the subdivision improvements, the applicant shall <br />install a trail connection with a locked gate along the north side of the <br />development that will provide access to the future public trail along the northerly <br />boundary of the subject development. The trail connection shall include an <br />approximately six-foot wide paved trail with landscaped shoulders and be <br />designed and graded to easily connect to the future public trail along the <br />northerly boundary of the subject development. Final design of the trail <br />connection and the related modifications to the PUD development plan shall be <br />submitted for Planning Commission approval as part of its review of the tentative <br />map. The applicant shall create access easements within the development to <br />allow City maintenance personnel to use the trail connection for accessing the <br />City owned right-of-way north of the development. The access easements may <br />be abandoned by the City in the future if another acceptable maintenance access <br />point becomes available, as determined by the Director of Community <br />Development. <br />23. Prior to City acceptance of the subdivision improvements, the applicant shall <br />install a public trail between the Mohr Avenue/Irongate Court intersection and the <br />northerly trail link on the subject project. The public trail shall be a Class C trail <br />installed per the specifications of the City's Trails Master Plan. The public trail <br />shall be shown on the subdivision improvement plans and shall be subject to <br />review and approval by the Director of Community Development and Director of <br />Parks and Community Services prior to issuance of building permits for the <br />project. <br />24. The garages shall all have automatic opening sectional roll-up garage doors <br />throughout the project. <br />25. The colors and materials of the retaining walls and the colors of the precast <br />perimeter wall shall be submitted for the review and approval by the Director of <br />Community Development prior to issuance of a building permit. <br />26. A final fencing plan generally conforming to the conceptual fencing plan shall be <br />submitted for review and approval by the Director of Community Development <br />with the subdivision improvement plans. <br />7 <br />