Laserfiche WebLink
i ( <br /> 47 . That approval cif the storr. drainage system be withheld <br /> pending final desir.n anc' „-111 the developer has demonstrated <br /> to the satisfaction c, i.u:e City Engineer that the system is <br /> adequate, connects t.c an approved point of discharge, meets <br /> any and all ppii bl : y11 ! _r,:s of the Alameda County <br /> Flood Control DLst ,.- I -- Zone 7 , meets any and all applicable <br /> requirements of the ;: . decal Emergency Management Flood <br /> Hazard Program, and meets the immediate and long-range <br /> requirements of this development and all upstream areas <br /> intended to he drained through this development. <br /> 48 . That electric power distribution, gas distribution, <br /> communication service , and any required alarm systems be <br /> installed underground in a joint utility trench unless <br /> otherwise specifically approved by the City Engineer. <br /> 49 . That the developer be responsible for the installation of the <br /> street lighting system serving the development. The street <br /> lights shall be 70 watt, high pressure sodium vapor units <br /> mounted on galvanized steel poles with poured in place bases, <br /> on the LS-1C schedule per City requirements and P.G.&E. <br /> standard dat:r;. ls unless otherwise specifically approved. <br /> Approval for the number , location , and type of electroliers <br /> shall be withhel(t pending final. design and review by the <br /> City Engineer . <br /> 50 . That this development provide a safe and effective circulation <br /> system for bicycles and pedestrains. These facilities <br /> shall be designed and installed to the satisfaction of the <br /> City Engineer and shall be separated from vehicular traffic <br /> whenever possible . <br /> 51 . That the developer submit detailed landscape and irrigation <br /> plans as part of the improvement plans. These plans should <br /> include, where applicable, a street tree planting plan and <br /> landscape plans for medians , buffer strips, and any right-of-way <br /> landscape areas . The irrigation plan shall provide for <br /> automatic coftrols . <br /> 52 . That any damage to street improvements now existing or done <br /> during construction on the subject property be repaired to the <br /> satisfaction of the City Engineer at full expense to . the <br /> developer. This shall include slurry seal , overlay, or <br /> street reconstruction if deemed warranted by the City <br /> Engineer . <br /> 53 . That the developer ' s contractor (s) obtain an encroachment permit <br /> from the City Engineer prior to the start of construction. <br /> 54 . That the developer install street trees as required per <br /> ordinance. <br />