Laserfiche WebLink
costs: <br /> <br /> Assessment Engineering: 2-1/2% of construction costs; <br /> Design Engineering: 6-1/2% of construction costs; <br /> Construction Staking: 3% of construction costs. <br /> <br /> In no event, however, will the compensation of Engineer <br />exceed the amount set forth by Engineer for that purpose in the <br />Report, or any amended Report, prepared by him under Section 10204 <br />of the Streets and Highways Code. <br /> <br /> Payment by Client of said compensation is contingent upon <br />the levy of assessments and the sale and delivery of improvement <br />bonds representing unpaid assessments in the assessment district. <br />If, for any reason, assessments are not confirmed and bonds <br /> <br /> Engineer's compensation <br /> <br />delivered, Engineer shall be paid no fee. <br />is payable upon delivery of the bonds. <br /> <br /> Dated: <br /> <br />ATTEST: <br /> <br />,1984 <br /> <br /> CITY OF PLEASANTON, a <br /> municipal corporation of <br />the S~~liforn~ <br /> Mayor <br /> <br /> <br />