My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENT 18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
022409
>
04 ATTACHMENT 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2009 11:33:14 AM
Creation date
2/20/2009 11:33:14 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/24/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
04 ATTACHMENT 18
Document Relationships
10
(Cross Reference)
Path:
\CITY CLERK\AGENDA PACKETS\2009\020309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recognizing the need for a coordinated planning effort at the local and regional <br />level and the collective benefits to the Tri-Valley as a region, the Tri-Valley Cities <br />and County hereby support the following phased approach to the local <br />transportation priorities in the Tri-Valley: <br />Phase 1: <br />Consists of the following arterial connections: Dublin Boulevard from its current <br />eastern terminus to Fallon Road as a 4 lane facility, Jack London Boulevard <br />between Isabel Parkway and EI Charro Road as a 2 lane facility (4 lanes at the <br />intersections of EI Charro Road and Isabel Parkway) and Stoneridge Drive from <br />its current eastern terminus to EI Charro Road as a 2 lane facility (with 4 lanes at <br />the intersection of EI Charro Road). <br />Phase 2: <br />Consists of the following arterial connections: Dublin Boulevard from Fallon Road <br />to North Canyons Parkway as a 4 lane facility and North Canyons Parkway from <br />its current western terminus to Dublin Boulevard as a 4 lane facility. In addition <br />to these new arterial connections, the following roadways will be widened: <br />Dublin Boulevard from Tassajara Road to Fallon Road to a 6 lane roadway, Jack <br />London Boulevard to a 4 lane roadway and Stoneridge Drive to a 4 lane facility. <br />With respect to these four arterials, each agency may choose to open the <br />roadway prior to the other arterials, however, it is the intent of this agreement to <br />have the local parallel arterial systems within each agency open at the same time <br />for each phase. <br />With the adoption of this Policy Statement each agency will support a request to <br />the CMA to support the project priority shown in Triangle Study Alternative 1A <br />and, further, upon construction of the Phase 1 improvements each member <br />agency will support the construction of State Route 84. <br />February 19, 2009 Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.