My WebLink
|
Help
|
About
|
Sign Out
RES 84115
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2012 1:19:23 PM
Creation date
1/20/2000 11:57:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/28/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-l: Update noise element <br /> <br />Actions 1 & 3 - Include updated noise policies, standards, <br />mitigations, and data in the General Plan Update. <br /> <br />E-2: Air quality standards <br /> <br />Actions i & 2 - Include air quality policies, standards and <br />mitigations in the General Plan Update. <br /> <br />E-3: Hazards and toxic air pollutants <br /> <br />Action I - Include policies, standards and mitigations for hazardous <br />air pollutants in the General Plan Update. <br /> <br />E-4: Hazardous materials storage <br /> <br />Action 1A - Include policies and actions for controlling hazardous <br />materials storage in the General Plan Update. <br /> <br />E-5: Hazardous materials transport <br /> <br />Action 1A - Include direct routes for the transport of hazardous <br />materials in the General Plan Update. <br /> <br />E-6: Sewage treatment capacity <br /> <br />Action 1A - Include policies and actions to phase industrial <br />developments according to sewage capacity in the General Plan Update. <br /> <br />E-7: Water quality and supply <br /> <br />Actions I - 5: Include policies and actions to preserve water quality <br />and supply in the General Plan Update. <br /> <br />E-8: Architectural Design Review Board <br /> <br />Action 3 - Include architectural design policies and guidelines <br />in the General Plan Update. <br /> <br />E-9: Arroyos for recreational pathways <br /> <br />Action 2 ~ Include policies and actions to utilize one side of the <br />arroyos for recreational pathways and preserve one side in their <br />"natural state" in the General Plan Update. <br /> <br />E-IO: Flora and Fauna <br /> <br />Action 1A - Include policies and actions to preserve flora and fauna <br />in the General Plan Update. <br /> <br />E-11: Open space and conservation element <br /> <br />Action I - Include policies and actions to preserve open space lands <br />in the General Plan Update. <br /> <br />-8- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.