Laserfiche WebLink
and approval of the Chief Building Official. The project developer is <br />responsible for ensuring that the contractor is aware of and implements <br />such measures; <br />b) All cut and fill slopes shall be revegetated and stabilized after completion of <br />grading, but in no case later than October 15. Hydroseeding shall be <br />accomplished before September 15 and irrigated with a temporary irrigation <br />system to ensure that the grasses are established before October 15. No <br />grading shall occur between October 15 and April 15 unless approved erosion <br />control/storm water quality measures are in place, subject to the approval of <br />City Engineer/ Chief Building Official. Such measures shall be maintained <br />until such time as permanent landscaping is place; <br />c) Gather all construction debris on a regular basis and place it in a dumpster <br />or other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution; <br />d) Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom sweep <br />the street pavement adjoining the project site on a daily basis. Scrape <br />caked-on mud and dirt from these areas before sweeping; <br />e) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any <br />debris or dirt flowing in the storm drain system. Maintain and/or replace <br />filter materials to ensure effectiveness and to prevent street flooding; <br />f) Create a contained and covered area on the site for the storage of bags, <br />cement, paints, oils, fertilizers, pesticides, or other materials used on the <br />site that have the potential of being discharged into the storm drain system <br />through being windblown or in the event of a material spill; <br />g) Never clean machinery, equipment, tools, brushes, or rinse containers into a <br />street, gutter, or storm drain; and <br />h) Ensure that concrete/gunite supply trucks or concrete/plaster operations do <br />not discharge wash water into street, gutters, or storm drains. <br />Stormwater Operation Requirements <br />72. All projects, unless otherwise determined by the City Engineer or Chief Building <br />Official, shall enter into a recorded Stormwater Treatment Measures Inspection <br />and Maintenance Agreement for ongoing maintenance and reporting of required <br />stormwater measures. These measures may include, but are not limited to: <br />14 <br />