Laserfiche WebLink
Job No. 19447.010 <br />Exhibit A <br />Page 1 of 12 <br />EXHIBIT A <br />PROPOSAL <br />For: TRANSPORTATION CORRIDOR PARKING LOT DESIGN AND HYDRO-MODIFICATION MASTER PLAN <br />Consultant agrees to perform the Services as listed in PART I below based on the following stated project status: <br />1. Project Description: Client intends to develop the 2.1f acre site (APN: 094-0105-001, 094-0105-002-O1 & -02, <br />094-0106-008-08 and 094-0106-011), a portion of the Transportation Corcidor located between Spring Street and <br />Angela Street, in the City of Pleasanton into a 100f stall parking lot and associated lighting, landscaping and <br />water quality features adjacent to the future City of Pleasanton Firehouse Arts Center, hereinafter called "Project". <br />Client desires to retain Consultant (and its Subconsultan[s) for the performance of civil engineering, land <br />surveying, hydromodification evaluation, landscape architecture, site lighting design and geotechnical evaluation <br />services to the generally accepted standards of practice in effect at the time of performance, for the project which <br />aze hereinafter called the "Services". <br />2. CEQA clearance completed or Negative Declaration granted, as required. <br />3. Record of Survey completed (by others). <br />4. Transportation Corridor Master Plan completed in 1998 by Richard Larson & Associates, currently being updated <br />by Richard Larson & Associates at direction of the City. <br />5. Phase 1 Environmental Si[e Assessment for the "Alameda County Transportation Corridor" prepared by BSK <br />Associates dated November 7, 2007. <br />Any of the above Services, listed as "completed" or "by others" are not included in Consultant's scope of Services. Any <br />requested Services for these items will be Additional Services. <br />PART I -SCOPE OF CONSULTANT SERVICES <br />A. Civil Enaineerina Services - MacKav & Somos <br />Civil Engineer shall be the Prime Consultant providing the Following general services: <br />1.0 COORDBQATION/MEETBQGS -Coordination of the project research and design effort by Consultant and <br />Subconsultants. <br />2.0 RESEARCH/DES[GN BASE -Research, control and surveying to establish appropriate base map, topography <br />and utility information for design effort by Consultant and Subconsultants. <br />3.0 DESIGN/CONSTRUCTION DOCUMENTS -Design and preparation of Construction Documents for civil <br />improvements of the Transportation Corridor Parking Lot (adjacent to the Firehouse Arts Center). <br />The general services above are filrther described by the following Task breakdown: <br />1.0 COORDBJATION/MEETEQGS <br />Task 1.1 Coordination meetings with City throughout the preliminary design process and final design effort, <br />anticipated to consist of bi-weekly meetings with City and Consultant team as well as a 50% and <br />90% design progress meeting with the City and Consultant team. <br />Task L2 Coordination with team Landscape Architect and City's Landscape Architect to incorporate the <br />Parking Lot and associated design elements with the Transportation Corridor Master Plan. <br />Task 1.3 Coordination with Project Team on design elements of hydro-modification, parking lot landscape <br />and lighting, PG&E power, and geotechnical considerations throughout design effort. <br />Task 1.4 Coordination with property owners adjacent to the Project site as required throughout the design <br />process. <br />Task 1.5 Miscellaneous Coordination with USA Markings, Potholing ConVactor and Bid Coordination. <br />Task 1.6 Project Administration -coordination of all Project Subwnsultants, including administrative tasks <br />related to contractual agreements, insurance and compensation of Subconsultants. <br />P \1994Totaa\COntract\1944]OIOLM-~rr+mon-'1}enspeomdor-Pxhi66-A-scope&ftta090105.doc <br />