My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
010609
>
04 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2008 12:42:34 PM
Creation date
12/22/2008 4:07:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/6/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
04 ATTACHMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TJ10N Mr. Joshua Pack, P.E, <br />Traaspsrlntlan May 29, 2008 <br />Coroul4nn Page b <br />Proposed Project Trip Generation <br />TJKM estimated trips for the proposed Ironwood Active Adult Community Development based on <br />Trip Generation (7th Edition), published by the Institute of Transportation Engineers (ITE). TJKM <br />utilized ITE Code 251 (Senior Adult Housing -Detached) for the proposed project. Based on rates <br />for this ITE Code, the proposed project is expected to generate approximately 587 daily trips on <br />an average weekday, including 30 trips during the a.m. peak hour and 53 during the p.m. peak hour. <br />The proposed project trip generation is shown in Table I. <br />Table 1: Trip Generation -Proposed Project <br />Land Use Daily A.M. Peak Hour P.M. Peak Hour <br />ITE Code <br />f ) SiZO <br />Rate <br />Trips <br />Rate <br />In% <br />Out% In Out Total <br />Rate <br />In% <br />Out% In Out Total <br /> Trips Trips Trips Trips Trips Trips <br />Senior Adult <br />i <br />l <br />Housing d <br />~ - 587 - 38 62 1I 19 30 - 61 39 32 21 53 <br />detached (251) <br />source: I np Generation (/th Etlition), Institute of Transportation Engineers (2003) <br />Note: du =Dwelling Unit <br />Daily Trip Rate = Ln(T) =0.85 Ln(X) + 2.38 <br />A.M. Trip Rate = Ln(T) =0.86 Ln(X) - 0.63 <br />P.M. Trip Rate = Ln(T) =0.72 Ln(X) + 0.58 <br />Project Trip Distribution and Assignment <br />TJKM developed trip distribution for the Ironwood project based on existing City counts, <br />knowledge of the study area, and consultation with City staff. The resulting expected projett trip <br />distribution is as follows: <br />• 30 percent to/from Santa Rita North <br />• I S percent to/from Santa Rita South <br />• 5 percent to/from Valley Avenue West <br />• 30 percent to/from Stanley Blvd West <br />• 15 percent to/from Stanley Blvd East <br />• 5 percent to/from Bernal Avenue South <br />The proposed project trips were assigned to the above roadways based on the calculated <br />distribution. Resulting volumes for Existing plus Approved Project plus Project Conditions are <br />shown in Figure 5. The Existing plus Approved Project Synchro file, which includes signal timings <br />and lane configurations, was used as the basis for developing the Existing plus Approved Project <br />plus Project Synchro file. <br />Level of Service Analysis Results -All Conditions <br />Table II shows the resulu of an intersection level of service (LOS) analysis for all three study <br />scenarios utilizing the Highway Capacity Manual (HCM) 2000 methodology. Attachment A details <br />the intersection LOS methodology, and Attachment B contains the LOS calculation sheets. It <br />should be noted that under all scenarios, a second westbound left turn lane was assumed at the <br />Valley Avenue /Santa Rita Road intersection (see Figure 2). This is a funded Ciry improvement that <br />is expected to be in place in the near term prior to completion of the Ironwood Active Adult <br />Community development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.