TEM _ R P UNI COS T TO
<br />
<br />
<br /> VII
<br />1 A ITARY
<br />SANITARY SEWER MANHOLE
<br />17
<br />EA
<br />$3,500.00
<br />$59,500.00
<br /> 2 8" PVC MAIN SDR-26 1,682 LF $42.00 $79,044.00
<br /> 3 FIELD CUT W/COUPLING 90 EA $150,00 $19,500.00
<br /> 4 SERVICE LATERAL 7 EA $900.00 $6,300.00
<br /> SUBTOTA $156,344.00
<br />
<br /> WA
<br /> 1 12"PVC C-900 CL-200 1,895 LF $65.00 $123,175.00
<br /> 2 COUPLING 60 EA $225.00 $13,500.00
<br /> 3 THRUST BLOCK 60 EA $300.00 $18,000.00
<br /> 4 LATERAL 7 EA $1,200.00 $8,400.00
<br /> 5 GATE VALVE 12" 4 EA $2,000.00 $8,000.00
<br /> 8 FIRE HYDRANT FULL ASSEMBLY 5 EA $4,900.00 $24,500.00
<br /> SUBTOTA $198,575.00
<br />
<br /> JOINT T
<br /> 1 PGBE, SBC, CABLE 1,925 LF $75.00 $144,375.00
<br /> SUBTOTA $144,375.00
<br /> MIS U
<br /> 1 EROSION CONTROL & MAINTENANCE 1 LS $25,000.00 $25,000.00
<br /> 2 HYDROSEEDING 120,000 SF $0.07 $8,400.00
<br /> 3 TEMPORARY FENCING CHAIN LINK 1,000 LF $4.00 $4,000.00
<br /> 4 VERSA LOCK RETAINING WALL 7,260 SF $40.00 $290,400.00
<br /> 5 C3 PLANTER WALL 1,630 SF $40.00 $65,200.00
<br /> 6 JOB CLEAN-UP 1 LS $5.000.00 $5,000.00
<br /> SUBTOTA $398,000.00
<br />
<br /> TOTAL ON31T $1,377,677.75
<br />
<br /> XI DESIGN $100,000.00
<br />
<br />I
<br />IV ARBORIST
<br />STAKING
<br />SOILS ENGINEER INCL. FINAL REPORT
<br />PROJECT MANAGEMENT etc." S5 000.00
<br />$35 000.00
<br />$25 000.00
<br />$173,600.00 .
<br />
<br /> CONSTRUCTION COS $1,718 277.75
<br />
<br /> 10°A CONTINGENC $171,627.78
<br />
<br /> TOTAL CONSTRUCTION COS $1,887,905.53
<br />"$10,600 for Portapotties, blueprints, safety,
<br />miscellaneous supplies
<br />"$56,000 for liability insurance
<br />"$107,000 for project management, supervision,
<br />project administration
<br />See attached explanatlon of crlterla and asaumptlona
<br />This estimate is not to I>a used for any financial decision or project scheduling by the user, until a qualified
<br />contractor confirms the unit costs herein. Venation of unit costs is affected try fluctuating costs of materials,
<br />availability of qualified construction subcontractors, and the difficulty of each project. This estimate should
<br />only be used as a starting point and for the user to become familiarized with fhe quantity of improvements.
<br />This estimate does not guarantee nor warrant that aU improvements, which may become necessary to
<br />complete the project, are represented herein.
<br />Please note that no conswcaon plans have been approved by the City when this estimate was prepared.
<br />Quantities or thickness of pavement section may change.
<br />
|