My WebLink
|
Help
|
About
|
Sign Out
18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
121608
>
18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2009 1:08:23 PM
Creation date
12/10/2008 5:09:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/16/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />DRAFT CONDITIONS OF APPROVAL <br />PAP 128 /PDRW -6, Jacob Reeves, T- Mobile <br />3001 Bernal Avenue <br />December 16, 2008 <br />1. The construction of the copula as the wireless facility for T- Mobile shall be in <br />substantial conformance to the plans, Exhibit A, dated "August 25, 2008" on file <br />with the Planning Division, except as modified by the following conditions. Minor <br />changes to the project may be allowed subject to prior approval by the Director of <br />Community Development, if found to be in substantial conformance with the <br />approved exhibits. <br />2. The personal wireless service facility shall adhere to the regulations contained in <br />Chapter 18.110, (Personal Wireless Service Facilities) of the Pleasanton <br />Municipal Code. <br />3. All conditions of approval for this case shall be written by the project developer <br />on all building permit plan check sets submitted for review and approval. These <br />conditions of approval shall be, at all times, on all construction plans kept on the <br />project site. It is the responsibility of the project developer to ensure that the <br />project contractor is aware of, and abides by, all conditions of approval. Prior <br />approval from the Planning Division must be received before any changes are <br />made. <br />4. Prior to operating the antennas, the project developer shall install all signage <br />required by the Federal Communications Commission. <br />5. Prior to the issuance of a building permit, the project developer shall submit to <br />the Building and Safety Division a report from a structural engineer, licensed by <br />the State of California, stating that the proposal would be structurally sound. No <br />building permit shall be issued until the Chief Building Officer reviews and <br />approves the structural report. <br />6. Prior to the issuance of a building permit, the property owner or authorized agent <br />for the project shall provide a financial guarantee to the Building and Safety <br />Division for the removal of the facility in the event that the use is abandoned, or <br />its approval terminated. The financial guarantee shall be 10 percent of the cost <br />of constructing the facility and shall be submitted in cash or as a bond. If <br />submitted as a bond, the bond shall be valid for a minimum of eleven (11) years <br />from the date of building permit issuance. Prior to the issuance of a building <br />permit, the property owner or the authorized agent for the project shall also sign <br />an interest waiver for the financial guarantee. In the event that the entire facility <br />is removed from the site, the property owner or authorized agent for the project <br />
The URL can be used to link to this page
Your browser does not support the video tag.