My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
121608
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2008 4:45:54 PM
Creation date
12/10/2008 4:45:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/16/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF V <br />-~- ~ CITY COUNCIL AGENDA REPORT <br />[~L£~S~NTONo <br />December 16, 2008 <br />Community Development <br />Engineering Division <br />TITLE: APPROVAL OF CONTRACT AMENDMENT NO. 1 WITH KIMLEY-HORN <br />AND ASSOCIATES FOR ENGINEERING SERVICES FOR THE DESIGN OF <br />SANTA RITA AND VALLEY AVENUE WIDENING IMPROVEMENTS, CIP <br />N0.975039 <br />SUMMARY <br />City Council awarded a contract to Kimley-Horn and Associates for design services and <br />preparation of construction documents for the subject project on March 4, 2008. During <br />the preliminary design phase, the need for additional engineering services was <br />identified. The additional design services are required due to the refined limits of work <br />which include replacing the entire traffic control signal system, mast arms, traffic cabinet <br />and pedestrian pork chop island. Staff is proposing that the initially approved not-to- <br />exceed contract limit of $111,684 be increased to $168,622, an increase of $56,938. <br />RECOMMENDATION <br />Approve Amendment No. 1 (Attachment 1) to the contract with Kimley-Horn and <br />Associates Inc., increasing the authorization of expenditures from anot-to- <br />exceed total contract amount of $111,684 to $168,622. <br />2. Authorize the City Manager to execute the attached contract amendment. <br />FINANCIAL STATEMENT <br />The subject project will improve traffic flow and no additional annual maintenance costs <br />are anticipated with these modifications. Funds for this work are included in the <br />approved Capital Improvement Program budget (see Attachment 2 for the project <br />Funding and Expenditure Summary). Contract Amendment No. 1 will result in an <br />additional cost not-to-exceed $56,938 to be paid from the project budget, CIP No. <br />975039. <br />
The URL can be used to link to this page
Your browser does not support the video tag.