Laserfiche WebLink
CAMP DRESSER & McKEE INC. <br /> <br /> Mr. Robert T. Okamura <br /> December 3, 1985 <br /> Page 7 <br /> <br /> Estimated Level of Effort <br /> <br /> Task 1: Evaluate Existing Turnouts $ 8,000 <br /> Task 2: Inventory Water Services 25,000 <br /> <br /> New Turnout: <br /> Design 20,000 <br /> Services During Construction 5,000 <br /> <br /> Pipe and Valve Modifications at Existing <br /> Turnout Nos. 1, 2, 3, and 4: <br /> Design 5,000' <br /> Services During Construction 4,000 <br /> <br /> Relocated Foothill Booster Pump Station No. 1: <br /> Analysis and Pipel ine Design 5,000 <br /> Final Design 28,000 <br /> Services During Construction 10,000 <br /> <br /> 50 Individual Booster Pump Systems or <br /> Water Service Improvements: <br /> Design 30,000' <br /> Services During Construction 16,000' <br /> <br /> Subtotal, Evaluation &Inventory: $ 33,000 <br /> Subtotal, Design 88,000 <br /> Subtotal, Services During Construction 35,000 <br /> <br /> TOTAL $156,000 <br /> <br />*These amounts will be re-estimated at the completion of Tasks I and 2. <br /> <br />Services described herein for the individual booster pump systems will be <br />for all CDM services on these systems and no compensation has or will be <br />requested under the current agreement dated April 10, 1984. <br /> <br />TIME OF PERFORMANCE <br /> <br />We can begin work within two days of receipt of authorization to proceed. <br />Tasks i and 2 can be performed in one month and, following the Task 3 meet- <br />ing, the design of all improvements can be accomplished in four months, <br />perhaps sooner. The services during construction will be in conformance <br />with the construction schedules of the Contractor. <br /> <br /> <br />