My WebLink
|
Help
|
About
|
Sign Out
PC 102208 Special Mtg
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2000-2009
>
2008
>
PC 102208 Special Mtg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2017 4:38:21 PM
Creation date
11/26/2008 3:34:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
10/22/2008
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Commissioner Narum inquired what would happen if the protection zone was <br />adopted, limiting it to 1,000, before the Sharks facility was actually approved, and if <br />this would affect the EIR. Ms. Giffin replied that so long as the EIR is certified prior <br />to this time, it would not impact the EIR. <br />Commissioner Pearce moved to recommend to the City Council certification of <br />the Final Environmental Impact Report (EIR) for the Staples Ranch project as <br />adequate and complete and adoption of the CEQA findings and the Statement <br />of Overriding Considerations for the project. <br />Commissioner Narum seconded the motion, with the inclusion of a Mitigation <br />Monitoring and Implementation Plan for the project. <br />ROLL CALL VOTE: <br />AYES: Commissioners Blank, Fox, Narum, Olson, and Pearce. <br />NOES: None. <br />ABSTAIN: None <br />RECUSED: None. <br />ABSENT: Commissioners Fox. <br />Resolutions Nos. PC-2008-49 recommending certification of the Final EIR for <br />the Staples Ranch project as adequate and complete; PC-2008-50 <br />recommending adoption of the CEQA findings and the Statement of <br />Overriding Considerations for the project; and PC-2008-51 recommending <br />approval of the Mitigation Monitoring and Implementation Plan for the project <br />were entered and adopted as motioned. <br />Commissioner Narum referred to the Draft Stoneridge Drive Specific Plan <br />Amendment for Staples Ranch and questioned some of the wording. She <br />expressed concern that there is no mention of the City's noise ordinance, given the <br />project's proximity to I-580. Ms. Giffin clarified that the noise mitigations are <br />contained within the EIR and that upon approval, the EIR document would go hand- <br />in-hand with the Specific Plan Amendment. <br />Chair Blank inquired whether or not it should be included, and Commissioner Narum <br />stated that it should be included as there is substantial noise issues from both the <br />airport and the freeway. <br />Ms. Giffin indicated that it could be added as a policy measure. She added that <br />when the PUD's come forward, they will fall back on a straight-zone district, which <br />automatically includes noise regulations. She noted that the EIR Mitigation <br />Measures are above and beyond those required by the Municipal Code. <br />Chair Blank expressed concern that five years from now, a developer may come <br />forward and say that the Specific Plan does not say anything about it. He noted that <br />PLANNING COMMISSION MINUTES, October 22, 2008 Page 10 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.