Laserfiche WebLink
Chair Blank: He complimented the applicants on the Green points. He requested that larger <br />four-by-four paint chips to facilitate the envisioning of the colors. He would like the <br />drainage issue addressed and see the location of the solar panels well depicted as well as <br />accurate visuals taken with the right photographic lens. He expressed concern with the <br />mass of the house shown on the west elevation from the street side with the gate and <br />proposed some detailing to make it less massive. He indicated that he would like the tennis <br />courts soundproofed and the windows properly shielded to avoid any noise or light impact <br />on the neighbors. He supported the standard construction hours as well as the open <br />fencing. <br />Mr. Pavan requested clarification in relation to the insulation of the solar panels and asked the <br />Commission if whether it would like to see exactly how panels will be done or see the line of <br />sight from the uphill neighbor looking across the building. <br />Chair Blank replied that he would like to see the line of sight and acomputer-generated photo <br />looking down at the panels to show what they would look like. <br />Mr. Pavan noted that when he discussed the visuals with the applicants, he had directed them to <br />include some photos from the Allens' house to replicate what they would be seeing from their <br />windows. He indicated that he would follow up on that. He stated that the construction hours <br />would be the standard Monday to Friday from 8:00 a.m. to 5:00 p.m. and that there would be a <br />standard building and engineering condition to address the flooding so that all year on-site water <br />is kept on site and drained appropriately into the City's drainage system. <br />Ms. Decker requested a point of clarification that Commissioner Fox would like to see a staff <br />memo on the setbacks and accessory structures and that Chair Blank would like to have that at a <br />workshop before the public hearing. She recommended that the materials be presented to the <br />Commission at a public hearing rather than have a second workshop. <br />Chair Blank indicated that he was fine with that and that he was not lobbying for or indicating <br />that he desired a second workshop. <br />Commissioner Fox requested that staff research the information in the Municipal Code as well <br />for the memo and that it be provided to the Commission ahead of time. <br />Ms. Decker indicated that staff would address the comments and questions presented tonight in <br />the staff report for the hearing and that other issues that come up at the hearing will be addressed <br />at that time. <br />Commissioner Fox inquired if the composite renderings would be available in the packet and <br />when the hearing date might be. Ms. Decker confirmed that the composites renderings would be <br />available and that she would need to look at the schedule to determine when it might be <br />scheduled. She noted that the meetings have a fairly impacted schedule but that staff would get <br />this on the schedule as quickly as possible in concert with the applicants' time frame to prepare <br />the requested renderings and landscape plans. <br />PLANNING COMMISSION MINUTES, January 9, 2008 Page 23 of 28 <br />