Laserfiche WebLink
CAMP DRESSER & McKEE INC. <br /> <br />Mr. Robert T. Okamura <br />December 3, 1985 <br />Page 3 <br /> <br />Task 4 - Prepare Preliminary Designs <br /> <br />Prepare preliminary designs of a new turnout from the Zone 7 system, a re- <br />locate Foothill Booster Pump Station No. 1, improvements at each of the <br />four existing turnouts, and water service improvements for 50 or less homes <br />along Foothill Road. Included will be land surveys for use in preparing <br />plans for the new turnout, the relocated pump station, and piping at these <br />two sites. Also included will be a geotechnical investigation at the site <br />of the relocated pump station. Land surveys and geotechnical work will not <br />be performed in connection with the individual booster pump systems or <br />water service improvements. <br /> <br />Task 5 - Meet with the City <br /> <br />Meet with the City, explain the preliminary designs, and discuss and re- <br />solve any problems in regard to the preliminary designs. <br />Task 6 - Prepare Final Designs. <br />Following approval of the preliminary designs by the City, the final <br />designs for the new turnout, the relocated Foothill Booster Pump Station <br />No. 1, improvements to the four existing turnouts, and individual booster <br />pump systems will be prepared. <br /> <br />Task 7 - Prepare Construction Plans, Specifications, and Bid Documents <br /> <br />Construction plans will be prepared showing all structural, mechanical, <br />civil, and electrical work relating to the Task 6 designs for the new <br />turnout and the relocated Foothill Booster Pump Station No. 1. Con- <br />struction plans for the improvements to the four existing turnouts and the <br />individual booster pump stations also will be prepared, but will be on <br />small-sized sheets and in less detail than the plans for the new turnouts <br />and the Foothill Booster Pump Station No. 1. The plans will be in detail <br />and in a manner to insure competitive bidding between contractors. <br />Detailed specifications and bid documents will be prepared covering all <br />items of work and materials involved in the construction program. <br /> <br />SERVICES DURING CONSTRUCTION <br /> <br />Task 8 - Respond to Bid Inquiries <br /> <br />Respond to the inquiries and clarification requests of the prospective <br />bidders and suppliers and prepare addenda, as required, to transmit <br />additional information to the bidders or for clarification of the bid <br />documents. <br /> <br /> <br />