My WebLink
|
Help
|
About
|
Sign Out
RES 85574
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2012 4:06:29 PM
Creation date
12/29/1999 7:28:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/17/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMP DRESSER & McKEE INC. <br /> <br />Mr. Robert T. Okamura <br />December 3, 1985 <br />Page 7 <br /> <br /> Estimated Level of Effort <br /> <br /> Task 1: Evaluate Existing Turnouts $ 8,000 <br /> Task 2: Inventory Water Services 25,000 <br /> <br /> New Turnout: <br /> Design 20,000 <br /> Services During Construction 5,000 <br /> <br /> Pipe and Valve Modifications at Existing <br /> Turnout Nos. 1, 2, 3, and 4: <br /> Design 5,000* <br /> Services During Construction 4,000 <br /> <br /> Relocated Foothill Booster Pump Station No. 1: <br /> Analysis and Pipeline Design 5,000 <br /> Final Design 28,000 <br /> Services During Construction 10,000 <br /> <br /> 50 Individual Booster Pump Systems or <br /> Water Service Improvements: <br /> Design 30,000* <br /> Services During Construction 16,000' <br /> <br /> Subtotal, Evaluation & Inventory: $ 33,000 <br /> Subtotal, Design 88,000 <br /> Subtotal, Services During Construction 35,000 <br /> <br /> TOTAL $156,000 <br /> <br />*These amounts will be re-estimated at the completion of Tasks 1 and 2. <br /> <br />Services described herein for the individual booster pump systems will be <br />for all CDM services on these systems and no compensation has or will be <br />requested under the current agreement dated April 10, 1984. <br /> <br />TIME OF PERFORMANCE <br /> <br />We can begin work within two days of receipt of authorization to proceed. <br />Tasks I and 2 can be performed in one month and, following the Task 3 meet- <br />ing, the design of all improvements can be accomplished in four months, <br />perhaps sooner. The services during construction will be in conformance <br />with the construction schedules of the Contractor. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.