ATTACHMENT 3
<br />Streetlight Replacement Project 2008 - 2009
<br />Bid Summary
<br />Bid Item # 1 1 B 2 3
<br />Bid Quantity: 56 10 80 1
<br />Contractor Total Bid
<br />Golden State Utility Co. 2,143.00 2,125.00 2,722.00 10,932.00
<br />120.008.00 21,250.00 217,760.00 10,932.00 $369,950.0
<br />ic~uiyavii ~ic~.un, nw. ~.,v.'v.w ~,.,~.,..... ...,..... ~.....
<br />114,800.00 13,100.00 205,200.00 7,125.00 $340,225.00
<br />WBE Electrical-Telecom-Securi 1,800.00 1,000.00 2,900.00 7,169.00
<br />100.800.00 10.000.00 232,000.00 7,169.00 $349,969.00
<br />Lawrence
<br />147
<br />124,600.00 17,000.00 203,200.00 15,000.00 $359,800.00
<br />MCH Electric Inc. 1,988.00 1,500.00 2,315.00 8,700.00
<br />111,328.00 15,000.00 185,200.00 8,700.00 $320,228.00
<br />Wingard Engineering Inc. 2,010.00 1,800.00 2,670.00 9,160.00
<br />112,560.00 18,000.00 213,600.00 9,160.00 $353,320.00
<br />.~ ~ ..~ n rnn nn n nrL+AA ~f 70A nA ~A 7~A nA
<br />I inhtinn
<br />141,792.00
<br />1
<br />Prism Engineering Inc. 2,474.60 600.00 2,943.70 4,324.60
<br />138,577.60 6,000.00 235,496.00 4,324.60 $384,398.20
<br />Inc.
<br />Annnln
<br />1
<br />
|